Sec. 16-202. - Final acceptance.

(a) Application. The developer or developer's contractor must make written application to the water and sewer department and the office of the city engineer for final approval and acceptance of the lift station. The city will notify the developer within thirty (30) days from the date of request, approving the lift station in writing or setting forth corrective measures necessary for approval. When any corrective action or improvements are necessary for approval, the developer or contractor must give the city written notice of completion dates. After corrective measures have been completed by the developer, a written request for approval must be submitted to the office of the city engineer and water and sewer department who shall have thirty (30) days to either approve or recommend further corrective measures. (b) Deeds. The developer shall present a warranty deed, on city form, duly executed by the property owner, conveying in fee simple to the city the property upon which the lift station is located, including adequate access and sufficient area to maintain and operate the station. The developer shall provide a property description and plat of the same by a licensed land surveyor of engineer unless said property is a lot of a recorded subdivision. (c) Cost. Upon final acceptance the city will assume payment of power costs. (d) Plans. At the time of final acceptance, the city shall have been provided at least two (2) copies of the operation and maintenance documents which shall include all design criteria, pump curves, dimensions and all pertinent data pertaining to the lift station in hard copy and electronic formats. The city shall also be provided with "as-built" drawings in CAD and PDF formats.

(Ord. No. 5882, § 2, 4-8-99; Ord. No. 7248, § 2, 5-13-08; Ord. No. 9790, § 3, 7-14-26)