§ 21-226 — Public infrastructure improvement bonds
Code of Ordinances of the City of Tuscaloosa, Alabama (Codified through Ordinance No. 9809, enacted August 25, 2026 (Supp. No. 103, Update 1)) · Tuscaloosa Code of Ordinances § 21-226
Corpus is an independent public-information project, not the official City of Tuscaloosa website. Stable reference: corpuslaw.us/code/c9db4e88-855a-4887-9284-ed5983173e98
Sec. 21-226. - Public infrastructure improvement bonds.
(a) The city engineer may require two (2) different public infrastructure improvement bonds (PIIB), on forms provided by the city. (1) The first PIIB (performance) may be required prior to the issuance of an LDP and shall cover damage to existing public infrastructure within construction limits during construction and failure to construct required public infrastructure improvements. a. The performance bond shall include good and sufficient surety in an amount equal to 1.10 times the amount of the construction costs of the public infrastructure improvements. The surety thereon must be approved by the city attorney and shall be one of the following: a cash deposit, an irrevocable letter of credit, or an insurance company doing business by an agent in the state through an attorney-in-fact. b. The performance bond shall be executed and submitted prior to the issuance of an LDP. The performance bond will be released after acceptance by the city of the covered public infrastructure improvements. (2) The second PIIB (maintenance) shall cover maintenance of the constructed public infrastructure improvements for no less than one year after acceptance by the City of the public infrastructure improvements. a. The maintenance bond shall include good and sufficient surety in an amount equal to ten (10) per cent of the construction costs of the public infrastructure improvements. The surety thereon must be approved by the city attorney and shall be one of the following: a cash deposit, an irrevocable letter of credit, or an insurance company doing business by an agent in the state through an attorney-in-fact. b. A fully executed maintenance bond shall be submitted in order for the covered public infrastructure improvements to be accepted by the city. The maintenance bond will be released when the maintenance period expires provided that all noted deficiencies, if any found during final inspection, have been corrected. The maintenance bond amount and/or duration may be increased by the city engineer where testing or other information indicates construction of the public infrastructure improvements does not meet minimum standards.
(Ord. No. 8603, § 4, 9-26-17; Ord. No. 9803, § 11, 8-11-26)
Ask a question about Tuscaloosa law
Corpus searches the Tuscaloosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.