For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-11 — Construction specifications and permits for dams or the impoundment of waters

Code of Ordinances of the City of Tuscaloosa, Alabama (Codified through Ordinance No. 9809, enacted August 25, 2026 (Supp. No. 103, Update 1)) · Tuscaloosa Code of Ordinances § 6-11

Corpus is an independent public-information project, not the official City of Tuscaloosa website. Stable reference: corpuslaw.us/code/1f2e2849-d104-4832-bfe2-0499d4065f6c

Sec. 6-11. - Construction specifications and permits for dams or the impoundment of waters.

In order to minimize the hazard of dams breaking and releasing impounded water to the detriment of lower riparian owners or other persons residing or owning property in the drainage area below such impoundment, the following rules and requirements for the construction of dams or the impoundment of water in the city or its police jurisdiction are hereby established: (1) All dams shall be designed by a professional engineer registered in the state, who is qualified by training and experience to design such dams. (2) All dams shall be designed in accordance with this section and with the engineering standards and specifications for construction of dams and ponds adopted by the city or required by the city engineer and shall comply with state health department regulations. In the case of small farm ponds in isolated areas, where it is determined by the city engineer that failure of the structure will not cause loss of life, serious damage to homes, industrial and commercial buildings, important public utilities, main highways, or railroads, the city engineer may waive, in writing, any of the design requirements of this section and permit the structure to be designed to the standards and specifications of the Natural Resources Conservation Service. The city engineer and planning director will take into account the existing or proposed land use adjacent to the site and the possibility of development below the dam site in determining if a waiver should be granted. (3) Sufficient soil borings and tests shall be made to insure that the foundation conditions at the dam site will support the proposed dam, and soil testings shall be made on the materials proposed to be used in the construction of the dam embankment to determine and establish the character and suitability of such material. (4) All tests performed on the dam foundation in the borrow areas and the dam embankment shall be performed by a testing laboratory or other person or agency qualified to perform such tests. (5) Prior to commencing construction, any person desiring to construct a dam shall request a construction permit from the city engineer. The permit request shall be accompanied by the plans and specifications for the proposed dam, along with required results of test boring and soil tests. Prior to issuing such permit the city engineer shall approve the proposed plans, specifications and test results and shall also require that the applicant obtain a permit from the state health department, and shall require that the proposed structure will be in compliance with state and federal requirements for construction controls to prevent air and water pollution, including, but not limited to, dust control and soil erosion control. (6) After the permit is received, construction may begin. A registered engineer, or such engineer's representative, shall be employed for construction supervision, and such engineer or representative shall be on the job when construction work is being done to insure that work is being done in accordance with the approved specifications for construction, and in accordance with the provisions of this section. (7) All earth embankments shall be compacted to not less than one hundred (100) per cent standard proctor density and field density tests shall be performed on each layer in accordance with AASHO and ASTM standard accepted methods. Copies of test results (which shall be performed by a testing laboratory or other qualified and approved agency or person), shall be furnished to the city engineer as the construction progresses. (8) Prior to impounding water behind any such dam for which a permit has been issued, the owner or other person constructing the dam, shall obtain an impoundment permit from the state department of public health and shall request an impoundment permit from the city engineer, which shall be granted after an inspection to determine that the construction has been completed in accordance with approved plans and specifications for the dam. (9) All specifications herein established shall apply with equal force when a dam is reconstructed or when the level of the impounded water behind an existing structure is sought to be raised or the water area enlarged. (10) It shall be unlawful for any person to construct a dam for the impoundment of water in the corporate limits of the city or in its police jurisdiction, unless a permit is first issued for such construction by the city engineer, and it shall be unlawful for any person to commence impounding water behind any such dam unless an impoundment permit is first obtained from the city engineer and state department of public health in accordance with the requirements of this section.

(Code 1962, § 10-10; Ord. No. 8820, § 22, 6-4-19; Ord. No. 9168, § 4, 1-11-22)

Ask a question about Tuscaloosa law

Corpus searches the Tuscaloosa sections it holds and shows the ones that match, with their citations. Free, no sign-in.