§ 11.04.04.01 — Required inspections
Code of Ordinances of the City of Conway, Arkansas (Codified through Ordinance No. O-25-35, enacted April 22, 2025. (Supp. No. 10)) · Conway Code of Ordinances § 11.04.04.01
Corpus is an independent public-information project, not the official City of Conway website. Stable reference: corpuslaw.us/code/138a480b-6833-4906-b495-010287d8dc6e
11.04.04.01 - Required inspections.
The following inspections shall be required: A. Underground. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping and conductors installed, and before backfill is put in place. Where excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or break the raceway, cable or conductors, or where corrosive action will occur, protection shall be provided in the form of granular or selected material, approved running boards, sleeves or other means. B. Rough-in. Rough-in inspection shall be made after roof, framing, fire-blocking and bracing are in place and wiring and other components to be concealed are complete, and prior to installation of wall or ceiling membranes. No job shall be considered as completely roughed-in until all joints have been soldered, rubber and friction taped, or approved connectors used, pigtails provided for the hanging of fixtures and overcurrent devices installed in the electrical panels. C. Final. The final inspection shall be made after all work required by the permit is completed. It is the responsibility of the electrical contractor to arrange for the structure or structures to be open in order that the inspection can be made. Occupied structures or structures containing personal property will not be entered by the inspector unless accompanied by the owner or owner's representative.
(Ord. No. O-12-03, Sec. 6)
Ask a question about Conway law
Corpus searches the Conway sections it holds and shows the ones that match, with their citations. Free, no sign-in.