For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 9.04.08 — Surfaces

Code of Ordinances of the City of Conway, Arkansas (Codified through Ordinance No. O-25-35, enacted April 22, 2025. (Supp. No. 10)) · Conway Code of Ordinances § 9.04.08

Corpus is an independent public-information project, not the official City of Conway website. Stable reference: corpuslaw.us/code/bcf4b750-4a21-48a7-8fb0-d80774046879

9.04.08 - Surfaces.

The surfaces included in these specifications shall be applied to the flexible and soil-cement base courses. A. Double Seal Coat. This surface shall consist of two (2) applications of bituminous materials and mineral aggregates. The first application shall be at the rate of 0.30 to 0.50 gallons of medium or rapid curing asphalt per square yard applied evenly with a pressure distributor, followed by an even application thirty (30) to fifty (50) pounds of mineral aggregate per square yard, rolled and broomed. Mineral aggregates shall conform to the State of Arkansas Specifications, Section 506 for Bituminous Surface Courses, Class No. 8. The second application will be at the rate of 0.30 to 0.50 gallons asphalt per square yard with following application of thirty (30) to fifty (50) pounds of mineral aggregate per square yard, rolled and broomed. The second application mineral aggregates shall meet Class No. 9 of the Arkansas Highway Specifications for Bituminous Surface Courses, Section 506. The roller shall have a weight of not less than two hundred (200) pounds per inch of tread. B. Hot Asphaltic Concrete. The hot asphaltic concrete shall meet and conform to specifications as outlined in the State of Arkansas Specifications 605 Asphaltic Concrete Hot Mix Surface Course and Mineral Aggregates meeting Type 3 Specifications. Section 607 on Material and Equipment for Hot Mix Surface Courses shall also be strictly adhered to. C. Resurfacing Existing Streets. There shall be no resurfacing of existing paved streets, except concrete or brick, until satisfactory evidence has been submitted by a registered professional engineer or reputable testing laboratory that the existing base materials meet the hereinbefore stated minimum thicknesses. Said engineer or testing laboratory will make thickness test of not less than nine (9) test holes uniformly staggered per three hundred (300) foot block to obtain a true picture of existing base.

(Ord. No. A-363, Sec. 8)

Ask a question about Conway law

Corpus searches the Conway sections it holds and shows the ones that match, with their citations. Free, no sign-in.