For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 170.05 — Performance Criteria

Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 170.05

Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/1f3c7f56-d2c4-4a4f-84c7-8abf03188fb7

170.05 - Performance Criteria

(A) Drainage Criteria Manual. The technical procedures and design standards contained in the Drainage Criteria Manual, adopted by §170.02 of this chapter and as may be amended from time to time by the City Engineer, shall be used to determine compliance with the performance criteria established by this chapter. (B) Performance Criteria. Except as otherwise provided in this chapter, a development must be designed, constructed, operated, and maintained to comply with the following stormwater sizing performance criteria. Each minimum standard is intended to be used in conjunction with the others to address the overall stormwater impacts from a development site. Supporting technical detail can be found in the Section 2.1 of the Drainage Criteria Manual (DCM): (1) Minimum Standard #1 — Water Quality. Reduce the average annual post-development total suspended solids (TSS) loadings from increased impervious areas either by TSS Reduction Method or the Runoff Reduction Method (RRM). (2) Minimum Standard #2 — Channel Protection. Provide extended detention to reduce flows and protect downstream channels from erosive velocities and unstable conditions. Post-development flows shall not exceed the predevelopment flows. (3) Minimum Standard #3 — Overbank Flood Protection. Provide peak discharge control of the storm events noted in the DCM such that the post-development peak rate does not exceed the predevelopment rate. (4) Minimum Standard #4 — Extreme Flood Protection. Provide peak discharge control such that the post-development peak rate does not exceed the predevelopment rate. (5) Better Site Design and Green Stormwater Practices, as described in the Drainage Criteria Manual, to attenuate lesser storms and more closely mimic predevelopment hydrology are encouraged. (6) Direct Discharge. Direct discharge of a pipe into streams and/or floodways is not allowed. A stilling basin or other structure that will collect sediment, trash, etc., and that will reduce the likelihood of erosion in the receiving stream due to discharge from the pipe shall be installed at pipe discharges into streams and/or floodways. (7) Erosion and Channel Stability. All stormwater management systems shall be evaluated based on their ability to prevent erosion and sedimentation of the receiving waters and adverse impacts on the site's natural systems. The design engineer shall consider the on-site and downstream effects of the peak discharges and shall design both the permanent and the construction phase of the stormwater management system in a manner that will not increase flooding, channel instability, or erosion downstream when considered in aggregate with other developed properties and downstream drainage capacities.

(Ord. No. 6446, §13(Exh. H), 6-15-21)

Ask a question about Fayetteville law

Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.