§ 171.07 — Occupation Of Streets And Highways By Public Utilities
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 171.07
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/15d652dc-425f-4861-b93d-b28e73f40ec6
171.07 - Occupation Of Streets And Highways By Public Utilities
Any public utility, as defined by state law, which occupies the streets, highways or other public places of the city under a franchise granted by the city or the state shall occupy said streets, highways or other public places in accordance with the requirements of the Minimum Street Standards and subject to the following terms and conditions: (A) Written Approval. A public utility shall not erect or place any facility more than 7 feet inside the right-of-way line for any street without the prior written approval of the City Engineer, who shall grant such approval only if he determines that the facility will not impair or obstruct present or future vehicular and pedestrian traffic. (B) Relocation. Whenever public utility facilities which are located within a public right-of-way must be relocated in order not to impair or obstruct vehicular or pedestrian traffic on any new or existing street, highway, road, or sidewalk, the public utility shall be required to relocate its facilities within a reasonable time from receipt of written notice from the City, and shall bear its own relocation costs; provided, where any project is funded with federal or state funds and said funds are received by the city for the purpose of reimbursing utility relocation expenses, the utility shall receive such reimbursement. This division shall not be construed as requiring a utility to relocate its facilities within or from a private easement without payment of just compensation. (C) City Engineer Approval. All proposed locations and utility designs shall be reviewed and subject to approval by the City Engineer to ensure that the proposed construction will not cause avoidable interference with existing or planned street facilities, or with street operation or maintenance. The procedure for submitting plans and information to the City Engineer for approval shall be developed and agreed upon by each utility and the City Engineer. (D) Street Design. When plans for street improvement and development are formulated, utility line locations should be recognized and the street designed so as to minimize conflict with existing utilities.
(Code 1965, §18-17.1; Ord. No. 2850, 8-17-82; Ord. No. 2926, 6-7-83; Ord. No. 3245, 3-3-87; Code 1991, § 98.14; Ord. No. 4100, §2 (Ex. A), 6-16-98; Ord. No. 5789, Repealed & Replaced Chp. 171, 8-4-15)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.