177.06 - Stormwater Facilities
(A) Applicability. All development required to install dry surface stormwater facilities (detention ponds) shall conform to the requirements herein. A landscape plan shall be submitted and approved prior to issuance of a permit or at the time of final plat (whichever is applicable). All required plantings shall be installed prior to issuance of a certificate of occupancy or filing of a final plat (whichever is applicable). Development that utilizes retention, underground or parking lot detention, or alternative stormwater management measures as approved by the Urban Forester and City Engineer shall not be required to meet the requirements of this chapter. (B) General Requirements. It is critical that selected plant materials are appropriate for soil, hydrologic and other existing site conditions. (1) All plants within required stormwater facility areas shall be appropriate species selected from the Landscape Manual or approved by the Urban Forester. (2) The design for plantings shall minimize the need for herbicides, fertilizers, pesticides or soil amendments at any time before, during and after construction and for a long-term basis. (3) Plantings should be designed to minimize the need for mowing, pruning and irrigation. Grass or wildflower seed shall be applied at the rates specified by the suppliers. If plant establishment cannot be achieved with seeding by the time of substantial completion of the stormwater facility portion of the project, the contractor shall plant the area with wildflower sod, plus, container plants or some other means to complete the specified plantings and protect against erosion as approved by the Urban Forester. (4) Plantings shall not impede the primary function of the stormwater facility, as identified in the Unified Development Code. Should plantings be proposed that call into question the ability of the stormwater facility to operate to the satisfaction of the City Engineer, the developer shall provide sufficient information (calculations, etc.) for review, at the time of submittal. (C) Detention Ponds. These are stormwater facilities that do not have standing water for more than a few hours per storm event. Vegetation helps improve infiltration functions, protects from rain and wind erosion and enhances aesthetic conditions. (1) The stormwater facility area is defined to be equivalent to the area of the detention basin, including the bottom and the side slopes, plus a 10-foot buffer around the detention basin. (2) The developer shall install minimum plant material quantities per 3,000 square feet of the stormwater facility area as follows: (a) One (1) evergreen or deciduous tree: (i) Evergreen trees: Minimum height of 6 feet. (ii) Deciduous trees: Minimum caliper of 1½ inch at 6 inches above the base. (b) Four (4) large shrubs/small trees, 3-gallon containers or equivalent. (c) Six (6) shrubs/large grass-like plants, 1-gallon containers or equivalent. (d) Ground cover plants, one (1) per 12 inches on center with triangular spacing, unless seed or sod is specified and installed. (e) At least 50% percent of the facility shall be planted with grasses or grass-like plants, or as otherwise required by the Unified Development Code. (f) Wildflowers, native grasses and ground covers shall be designed to require mowing no more than twice annually. (3) Trees planted within stormwater facilities may be utilized to meet on-site tree mitigation requirements, subject to approval by the Urban Forester.
(Ord. No. 4917, 9-05-06)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.