§ 179.02 — Applicability
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 179.02
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/753bf22f-f73e-4fb1-b259-c9c043739ce2
179.02 - Applicability
(A) Development Approval. The standards and guidelines contained in Chapter 5 of the Drainage Criteria Manual shall apply in all cases where a land developer chooses to utilize LID to obtain Administrative, Planning Commission or City Council approval for their project. (B) Engineering Approval. The City Engineer, or their designee, will administer this chapter and shall be responsible for final approval of all LID systems and structures. With the approval of the City Engineer, LID systems and structures may be implemented. (C) Drainage Criteria Manual. The Drainage Criteria Manual integrates LID design principles throughout the manual. Submittal requirements for LID projects are found within the submittal requirements for a drainage report. Criteria for the design of specific LID elements, criteria for receiving credit for those elements through reductions in traditional stormwater infrastructure, and maintenance requirements are detailed in Chapter 5 of the DCM.
(Ord. No. 5316, 4-20-10; Ord. No. 5702, Repealed & Replaced Chp. 179, 8-5-14)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
