§ 51.110 — Connection Required
Code of Ordinances of the City of Fayetteville, Arkansas (Codified through Ordinance No. 7010, enacted June 16, 2026 (Supp. No. 42)) · Fayetteville Code of Ordinances § 51.110
Corpus is an independent public-information project, not the official City of Fayetteville website. Stable reference: corpuslaw.us/code/1b7301a6-ef27-4063-a06e-bb508c96cbe2
51.110 - Connection Required
(A) When Connection Required. Within twelve (12) months from the date on which city sewer service becomes available in those areas where service is not presently available, all owners of property on which structures are located having points of water usage within 200 feet of a city sewer line shall construct upon their properties sanitary sewers leading from said points of water usage to the sanitary sewer of the city, for the purpose of conducting sewage and liquid wastes into the city's sewerage system. (B) Failure to Make Connection. If a property owner shall fail, neglect, or refuse to connect to a city sewer line within the time prescribed by subsection (A) hereof, unless further time be granted by the mayor for such connection, it shall be the duty of the city water and wastewater director to order a discontinuance of water service by the city to the property where the owner fails, neglects, or refuses to make the sewer connections. (C) Approval of Superintendent Required. Any property owner making the sewer connection required hereby shall first obtain the approval of the City Water and Wastewater Director for the nature and character of the materials to be used in the construction of said sewer connection, the place of tapping the sewer line of the city, and the manner of doing the same.
(Code 1965, §21-5.1; Ord. No. 1742, 6-1-70; Ord. No. 2095, 4-1-75; Code 1991, §51.110)
Ask a question about Fayetteville law
Corpus searches the Fayetteville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
