For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 11-82 — Definitions

Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 11-82

Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/bd595102-d994-4768-b776-ca46e6fd7c04

Sec. 11-82. - Definitions.

The following words, terms and phrases, when used in this article shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: ADEQ means the Arkansas Department of Environmental Quality. Clearing means any activity that removes the vegetative surface. Cut. See Excavation. Erosion and sediment control plan means a set of plans indicating the specific measures and sequencing to be used to control sediment and erosion on a development site during and after construction Erosion control means any measure that prevents erosion. Excavation means the mechanical removal of earth material from water or land. Fill means the deposit of earth material placed by artificial means. Grade means the percentage of rise or fall per 100 feet. Grading means any stripping, cutting, filling or stockpiling of earth or land. Grading permit means a permit issued by the city for the construction or alteration of ground improvements and structures for the control of erosion, runoff and grading. Grading plan means a plan indicating the specific measures and phasing to be used to grade a development site during construction. NPDES means the National Pollutant Discharge Elimination System. Phasing means clearing a parcel of land in distinct phases, with the stabilization of each phase completed before the clearing of the next. Sediment control means those measures that prevent eroded sediment from leaving the site. Site means a parcel or lot of land or contiguous combination thereof, where grading is performed or permitted. Stabilization means the use of practices that prevent exposed soil from eroding. Utility line means any public or franchised utility line, including water, sewer, gas, telephone, electric, fiber optic, cable television or stormwater. Watercourse means any body of water, including, but not limited to lakes, ponds, rivers, streams, and bodies of water delineated by the city. Waterway means a channel that directs surface runoff to a watercourse or to the stormwater system.

(Code 1992, § 11-82; Ord. No. 27-06, § 1, 3-21-2006; Ord. No. 54-11, § 1, 7-5-2011)

Ask a question about Fort Smith law

Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.