Sec. 17-32. - Time limit on commencement of drilling operations.

The drilling operation must begin within six months of the authorization, unless a special time limit less than six months has been imposed by the city administrator, or his designated agent.

(Code 1976, § 19.5-7; Code 1992, § 17-32)