§ 22-77 — Permit required; application; permit issuance, fee

Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 22-77

Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/276e539a-b047-4385-905f-5e2317dd789d

Sec. 22-77. - Permit required; application; permit issuance, fee.

(a) It shall be unlawful for any person to construct, reconstruct, alter, remove and/or replace any curb, curb and gutter or driveway approach on public property within the city without first having obtained a permit from the city administrator. All such construction, reconstruction, alteration, removal or replacement shall be under the supervision of the city administrator and in accordance with the specifications hereinafter provided, except that the replacement of driveway approaches existing at the time of the adoption of this article shall not require construction with a surfacing of a greater standard than existing at the time of application for permit. (b) Before a permit required by subsection (a) of this section shall be issued, the property owner or his duly authorized agent shall submit an application therefor in writing with a plan made a part of such application showing the location, design and layout of the proposed improvement and its relation to the property lines. For residential driveway approaches from minor streets, as determined by the master street plan, and with curb and gutter, the application may be part of the plot plan required for a building permit. (c) When such written application and plan conforming to subsection (b) of this section and the other provisions of this article have been duly submitted, and the fee hereinafter required is paid, the city administrator shall issue a permit for such improvement. (d) A fee in the amount established by the board of directors shall be charged by the city administrator at the time of application for a permit, and such sum shall be paid into the general fund of the city; provided, however, where a general contractor constructs and pours his own driveway approaches as a part of new building construction, there will be no additional fee for the driveway approach permit.

(Code 1976, § 27-34; Code 1992, § 22-77; Ord. No. 42-95, §§ 1, 2, 5-16-1995)