§ 27-333 — Subdivision—Major
Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 27-333
Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/ba4bc1f3-025f-4c90-9c5b-8a2910553ceb
Sec. 27-333. - Subdivision—Major.
27-333-1 Applicability. This section applies to: A. New subdivisions with six or more lots; B. New subdivisions with fewer than six lots that are not a minor subdivision; C. Any commercial subdivision with limited frontage as provided in section 27-335; D. Any proposed development that will generate at least 51 trips per day, as determined by the trip generation manual); or E. Any plat that involves an extension of streets or utilities. A plat with minor utility extensions may be processed as a minor plat. 27-333-2 Replatting of existing easements. The planning commission may vacate, abandon and relocate any existing platted easements for the benefit of the city or its own utility functions (but not public utility easements) through the subdivision platting process. Prior to exercising such authority, the planning commission will request the recommendation of appropriate city departments and all franchised public utilities. Any developer desiring to replat an existing easement pursuant to this section must accurately identify, by legal description, dimensions and allowed usages, and the easement to be vacated, abandoned or relocated, in the proposed plat. Any error in the identification shall negate the replatting effect on the existing easement. 27-333-3 Concept plan. A. Applicability. At the applicant's discretion, the planning commission may review and approve a concept plan for major subdivisions that will be built in phases. B. Initiation. The applicant shall file the concept plan with the director. The concept plan shall include the following elements: 1. Lot configuration; 2. Street layout; 3. Location and size of parks and open space; 4. The location of any resource conservation areas subject to section 27-510; 5. Location and anticipated demands for utilities and improvements such as streets, stormwater management, water, wastewater, fire protection, parks and recreation, and schools; and 6. The proposed uses for the ultimate development of the entire property under common ownership. C. Review. 1. The director shall review the concept plan and submit any comments verbally or in writing. The director shall then forward the concept plan to the planning commission. 2. The planning commission shall review the concept plan and submit its comments to the applicant verbally or in writing. The concept plan shall not be formally approved or denied. The concept plan is not binding on the preliminary or final plat application, and serves only to provide information to the planning commission about the general development concepts included in subsequent plat applications. 27-333-4 Preliminary plat. A. Applicability. A preliminary plat shall be approved for all major subdivisions prior to review of a final plat and the submission of construction drawings. B. Applicant. An application for a major subdivision may be initiated by the board of directors, planning commission, property owner, or the owner's agent. C. Pre-application conference. A pre-application conference is required pursuant to section 27-302. D. Submission requirements. The director shall prepare an application form which specifies the information to be submitted in support of a major subdivision application. This shall include, at a minimum: 1. A preliminary development plan if subdivision request is submitted with another development application. 2. Preliminary plat, if there is no preliminary development plan, shall include: a. The development plat shall be submitted electronically as a PDF file and on paper no larger than 24 inches by 36 inches, with at least one copy of each page provided on an 11-inch by 17-inch paper. The development plat shall be drawn to a scale of no less than one inch equals 20 feet unless the director approves a different scale; b. The name, address, telephone number, and e-mail address of the landowner and architect/engineer/surveyor/planner/contractor shall be provided. An authorization of agent from the property owner shall also be provided, which acknowledges and approves the application submitted on the owner's behalf; c. The date, north arrow, scale, existing zoning classification and proposed zoning classification; d. Vicinity map at a scale of not less than one inch equals 500 feet; e. Legal description of property (preliminary plats shall include all contiguous, adjacent, and/or nearby land under the ownership and/or control of the developer) including boundary dimensions sufficient to accurately locate the property; f. Adjoining subdivisions/lots/streets/alleys/easements; g. Subdivision acreage; h. Original lot configuration shown with dashed lines when replatting existing lots; i. Topographic information at two-foot intervals, including physical features, buildings, streams, drainage facilities, etc.; j. Flood boundaries as identified on the official flood insurance rate map (FIRM); k. Location and dimensions of proposed streets, alleys, easements, and lot lines; l. Street names, lots, and block numbers; m. Preliminary street centerline curve radii and right-of-way widths; n. Proposed drainage facilities, including approximate structure sizes and types; o. Location and purpose of easements, including existing and proposed public and private water supply and sanitary sewer lines. Show existing franchise utilities. Identify book and page where applicable; p. Proposed buildings and other development features where applicable on commercial, industrial, and multifamily developments. 3. Application fee. 4. Technical studies pursuant to section 27-303-2. 5. Other information as specified on the application form or as requested by the director, other departments or agencies, the planning commission, or the board of directors. E. Application and review procedures. 1. Determination of completeness. Applications shall be submitted to the director for a determination of completeness pursuant to section 27-303. An application is complete when all of the items required by the unified development ordinance and on the application form are prepared and/or answered, and any required supplemental or additional applications are submitted with the appropriate fee to the planning and zoning department. 2. Staff review. Following a determination of completeness, the staff shall review the application pursuant to section 27-305. 3. Public hearing. Following completion of staff review, the application shall be scheduled for a public hearing before the planning commission. F. Planning commission action. Following the public hearing, the planning commission may approve, approve as amended, or deny the application. The planning commission may also continue the application to a date certain. 1. Approve. Approval of the preliminary plat shall be granted by the planning commission when all applicable conditions of this chapter are met. 2. Approve as amended. The planning commission may require amendments to a preliminary plat prior to approval. This may include approval of completed engineering documents following plat approval provided stipulations for approval are provided. Upon approval with amendments, the planning commission shall state the amendments required and transmit them in writing to the applicant. 3. Denial. The planning commission may deny the preliminary plat. The reasons for the denial shall be clearly stated in writing and transmitted to the applicant. G. Standards. The preliminary plat shall be approved if it complies with all applicable standards of this chapter. H. Effective period of approval. The approval or conditional approval of a preliminary plat shall be effective for a period of two years. Any preliminary plat which has been approved or conditionally approved by the planning commission shall be null and void if a final plat for the subdivision has not been submitted to the planning commission within two years of the approval date of the preliminary plat. The director may extend this time period at the applicant's request if he determines that no material changes to the standards in this chapter have occurred since the original approval. In reviewing a preliminary plat that has been voided by the passage of time and resubmitted, the planning commission is not bound by a previous approval. I. Existing regulations compliance. The preliminary plat shall conform to all city regulations in effect at the time of planning commission action. However, any preliminary plat that has been approved or conditionally approved shall be exempt from any subsequent amendments to the zoning regulations or improvement requirements that would otherwise render that plat nonconforming. However, the effective period of the planning commissions' approval must still be in effect. 27-333-5 Final plat—Purpose. The purpose of the final plat is to create a document for recording which is substantially the same in terms of lot configuration and overall design as the preliminary plat and accurately describes the developed land and other legal provisions which are pertinent and relate to the development. A. Applicability. No subdivision plat shall be recorded until a final plat is approved by the planning department and signed as provided below. B. Submission requirements. The director shall prepare an application form which specifies the information to be submitted in support of a final plat application. C. Initiation. A final plat may consist of all of the area or part of the area outlined in the preliminary plat. The director shall forward the final plat to all appropriate city departments and public utilities for their review and comment. After receipt of a complete application for final plat approval, the director shall recommend approval or denial of the final plat. D. Review and decision. Action must be taken on all final plats submitted to the planning commission within 35 days of the date of the official meeting of the commission where the initial review occurred. If no action is taken by the planning commission within 35 days, the final plat is deemed approved. The planning commission shall not attach any conditions to the final plat for a major subdivision unless agreed to by the applicant. E. Standards. The planning commission shall approve the final plat if it complies with the following: 1. All applicable standards of this chapter; and 2. All conditions attached to the preliminary plat. F. Effective period of approval. An application for final plat approval expires if a final plat is not approved within two years from the date that the final plat application was formally submitted. G. Plat recording procedure. After all required approvals of the plat and the affixing of all required signatures on the original tracing and other copies and associated documents, the final plat will be filed with the county recorder. 27-333-6 Infrastructure improvements. A. Applicability. The developer is responsible for construction of subdivision improvements, including engineering design and construction administration, in accordance with the design approved by the city. The developer will execute an agreement (acknowledgment form letter) guaranteeing that the construction will conform to the plans and design documents approved by the city. This acknowledgment form letter must be posted prior to final approval of construction plans and design documents. The developer shall provide all required plans and design documentation for review by the appropriate city departments, franchise utility companies and governmental agencies. Construction plans shall be approved and all improvements shall either be completed and accepted by the city or a performance guarantee shall be posted with the city in accordance with section 27-513 to ensure the completion of the improvements before approval of a final plat. B. Initiation. 1. Construction plans and documentation. Plans and documentation for improvements shall be prepared, sealed and signed by a professional engineer registered in the state. Plans and design documentation shall conform to the city engineering design standards. 2. Project changes. Changes in the design or construction of a project or development, including changes in the plans or specifications, shall be submitted to the city for approval. The city shall be notified immediately (by telephone or other means) of field changes in order that a timely approval may be issued. 3. Project coordination and scheduling. No construction of improvements shall begin until a pre-work meeting with the consulting engineer, contractor and city personnel has been conducted and a construction schedule established. The city shall be notified of all interruptions in the work and changes to the schedule. C. Construction administration. 1. Generally. The developer shall provide for construction administration, including inspection, testing and final documentation, throughout the construction of the subdivision improvements. The city reserves the right to inspect the construction at all times. 2. Inspection and testing. The city engineer or service provider shall approve all materials, construction, and quality control testing employed in improvements. The developer shall provide all inspection and testing except as otherwise stated herein. 3. Inspection by developer. The developer shall provide for inspection of improvements during construction. Inspection shall be accomplished under the supervision of the design engineer. The engineer will provide certification that all materials and construction conform to the approved plans and specifications. 4. Inspection by city. The construction of improvements is subject to inspections by the city at various stages including, but not limited to, connection to existing water and sanitary sewer systems, street subgrade, base course, surfacing and any other stage identified at the pre-work meeting. An inspection for a particular stage will not be conducted until the pertinent test data have been submitted. Scheduling of construction shall provide sufficient time for review of test data and scheduling inspections. A representative of the engineering firm responsible for the project shall be present at the inspections. D. Record documents. Record drawings (as-built plans), test reports, catalogue data, shop drawings and related information shall be provided by the developer's consulting engineer. Record drawings shall depict an accurate account of the constructed improvements. The consulting engineer shall provide written certification that constructed improvements conform to the approved plans and to the city's standard specifications and detail drawings. Where applicable, maintenance bonds shall be delivered with the record documents. E. Acceptance by city. Acceptance of improvements by the city will be acknowledged in writing upon completion of all requirements. Initial acceptance will be for a temporary warranty period as specified in the city's design standards. F. Effective period of approval. Approval of construction plans shall remain in effect for one year from the date of approval by the city. The director of engineering may extend this time for a period not to exceed one year upon request from the applicant. A request for extension must be made at least 30 days prior to the original expiration date. 27-333-7 Subdivision improvement agreements. The city may enter into an agreement with the applicant to provide the required improvements. All formal agreements entered into by the city will be with the developer only.
(Ord. No. 18-20, § 2(att.), 3-3-2020) (Code 1992, § 27-333; Ord. No. 64-15, § 1(att.), 10-6-2015)
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.
