Sec. 27-703. - Commercial communication towers.
27-703-1 Purpose. The purpose of these regulations is described as follows: A. Minimize the adverse effects and impact of towers through careful design, siting and screening; B. Conserve the value of adjacent land and buildings; C. Avoid potential damage to adjacent properties through engineering and careful siting of tower structures; and D. Maximize the use of existing towers in order to reduce and minimize the number of towers needed. 27-703-2 Approved tower locations (zoning districts). As defined herein, commercial communication towers are prohibited within any public right-of-way, utility easement or residential, C-1 and C-2 zoning districts unless granted by conditional use permit. Such uses are allowed by right within the C-3, C-4, C-5, C-6, I-1, I-2, and I-3 zoning districts subject to applicable zoning restrictions as well as the following restrictions set forth herein. 27-703-3 Ownership. The proposed location for the tower must be large enough to accommodate the communications tower and support facilities, and must include access to a public right-of-way or accessible parking area. Purchase or ownership of a separate parcel may require platting and improvements before construction permits can be issued. 27-703-4 Construction. In order to minimize visual impacts and possible damage that can result from the presence of such facilities, towers (including attached antennas) are limited to monopole construction and shall not exceed 200 feet in height. Compliance with all requirements of the city building code, including a licensed engineer's structural certification of the tower structure and foundation, must be demonstrated before a building permit will be issued. 27-703-5 Setback. All commercial towers must meet the minimum setbacks for the zoning districts in which they are located. Additionally, commercial towers must be set back from any residential structure a number of feet equal to that distance stated by the tower manufacturer's registered structural engineer's determination of the maximum possible fall zone for the tower. The structural engineer shall be licensed in the state. 27-703-6 Appearance. No lights, signals or illumination shall be permitted on any tower unless required by the Federal Communication Commission (FCC), Federal Aviation Administration (FAA), or other federal, state, or city agency. No commercial advertising, signage or flags shall be allowed on any tower. This shall not prevent the joint use of a legal existing sign structure as a support mechanism for antennas or microwave dishes. Towers and accessory facilities must be colored or painted in muted tones that minimize their visibility, unless otherwise required by the FCC, FAA, or other federal, state, or city agency. The applicant may be required to disguise, conceal or camouflage a tower and/or antenna to ensure compatibility with the surrounding area. 27-703-7 Site design. The area containing the monopole, accessory and support structures, and the immediate surrounding area utilized for servicing of the communication tower shall be secured by a minimum eight-foot-height chainlink fence. The area within the fence must be either paved or graveled and kept weed-free. Other than the street side of the site, any side that faces any residential use shall include opaque fencing or sufficient shrubs to screen the site. Any shrubbery provided will be planted and maintained within the next appropriate growing season. If security lighting is installed, such light should be directed downward within the site and only triggered by motion detectors. 27-703-8 Co-location. To minimize tower proliferation, each applicant proposing to construct a commercial communication tower shall with the building permit or conditional use permit application submit a statement of the following in writing: 1. Whether any tower or suitable structure exists, within the geographic area to be served by the proposed new tower, which meets the applicant's engineering requirements; 2. Whether existing towers or suitable structures are of sufficient height to meet the applicant's engineering requirements; 3. Whether existing towers or suitable structures have sufficient structural strength to support applicant's proposed antenna and related equipment; 4. Whether the fees, cost, and/or contractual provisions required by the owner of an existing suitable site for co-location of the applicant's antenna are commercially reasonable; and 5. Other significant limiting factors make existing towers or structures unsuitable for co-location of the proposed antenna. A. The permit issuing agent of the city shall utilize the submitted information, together with other available information, to determine whether co-location may be waived and a new commercial communication tower be authorized for construction. B. The decision of the agent of the city concerning co-location may be appealed to the planning commission. Any interested party may file an appeal provided that the appeal is filed with the planning commission by 5:00 p.m. on the tenth calendar day following the date of the decision by the agent. A fee in the amount established by the board of directors is required for filing an appeal. C. Antennas may be placed wholly within or upon any building located within a commercial or industrial zoning district as permitted in subsection 27-703-2, or any publicly-owned building, provided any supporting equipment is screened from nearby residential districts. A commercial antenna may be mounted to the exterior of such buildings if integrated into the overall architectural design of the building. Roof-mounted antennas may not extend more than 20 feet above the highest point of the roof structure, and provided any supporting equipment is screened from nearby residential districts. A commercial antenna may be attached to any utility structure (such as a water tower or electrical transmission tower) or to a public building not located in a street right-of-way and owned by a government or public agency, provided that the antenna does not extend more than 20 feet above the height of the structure, provided any supporting equipment is screened from nearby residential districts. At the time a building permit is issued, the planning and zoning department may notify all existing telecommunication providers of the opportunity for co-location. Notice of a desire to co-locate shall be given within 60 days of the receipt of said notice. D. To further minimize tower proliferation, the city states its intention to consider the providing of properties owned or controlled by the city as sites for co-location of commercial communication towers. Any person desiring to locate a commercial communication tower on property owned or controlled by the city may make application for co-location by submitting the request with the following information to the city administrator, or administrative officials of the city designated by the city administrator. 1. A description of the facility proposed to be located on city-owned or controlled property with all information required by this section; and 2. The identity of city-owned or controlled property as to which co-location is required or, in the alternative, a request that the city administrator examine and provide potential co-location sites within any geographically described area by the applicant. Within 45 days of receipt of such application, the city administrator, or his designated agent, shall determine the availability of potential co-location sites on city-owned or controlled property. The city administrator will make that determination after evaluating the effect that co-location would have on the purpose for which the city owns or controls the subject property. The administrator shall, within that time period, identify in writing any potential co-location sites available for co-location and shall identify required installation procedures, operating procedures, liability insurance and compensation factors involved in the co-location. If the applicant concurs in the potential use of any co-location site identified by the city administrator, the proposed arrangement for co-location shall be placed in writing and submitted to the governing body of the city for approval or rejection. 27-703-9 Traffic and parking. Vehicular access to the tower site shall be limited to a major street if the site adjoins both a major street and a local street. If the tower site contains on-site personnel, at least one space shall be provided for each two on-site personnel plus one additional space. 27-703-10 Application (submittal) requirements. A building permit is required for any new tower construction, tower addition, or tower alteration. A structural engineer's structural certification is required for any construction, addition or alteration to a tower structure. A building permit is required for the addition or relocation of any antenna or equipment on a tower. The city's building department may request certification by a registered engineer that the requested action on any antenna or equipment will not cause the certified structural loading of the tower to be exceeded. 27-703-11 Exemption. An antenna and tower for the following uses are exempt from these requirements and are permitted uses in any district if accessory to a permitted use and if they comply with the applicable regulations of the district in which they are situated: 1. Ham radios; 2. Citizen band radios; and 3. Radio, television receiving and broadcasting. 27-703-12 Conflict with FCC or FAA Regulations. In the event there is a direct conflict between these regulations and Federal Communication Commission (FCC) regulations or Federal Aviation Administration (FAA) regulations, or any other federal or state regulations, said regulations shall govern. 27-703-13 Abandoned facilities. At such time that the tower ceases to be used for communication purposes for a period exceeding 12 consecutive months, the owner shall dismantle and completely remove the tower and all associated equipment from the property and make all reasonable efforts to return the property to its prior condition. 27-703-14 Variances. The board of zoning adjustment shall hear request for variances from the literal provisions of the zoning chapter in accordance with the requirements set forth in section 27-337. The denial of a variance request shall be in writing and supported by substantial evidence in a written record. 27-703-15 Annual action plan submittal. On or before January 15 of each new year, all telecommunication providers which are not expressly exempted by other provisions of this section shall, on a good faith basis, forecast the number of improvements and/or installations planned with the city within the ensuing 12 consecutive months. The information shall be submitted to the city planning department. The information obtained from all companies shall be analyzed and compared as to redundancy or geographic duplication of facilities. Where it is determined that a potential for co-location exists, the affected companies will be contacted and a meeting shall be arranged for the purpose of plan review. The city acknowledges that some or all of the data and information to be provided on an annual basis to the city by the telecommunication providers may contain confidential information in which the respective provider has a proprietary interest. The city also acknowledges that such information or data, if disclosed, might give some advantage, economic or otherwise, to the provider competitors. Consequently, the city agrees that its board of directors, administration staff and employees will maintain the confidentiality of such information or data to the fullest extent possible under the federal and/or Arkansas Freedom of Information Acts. If no capital facilities expansion is planned for the coming year, a letter to that effect shall be submitted to the city planning department. 27-703-16 Permit construction time line. Upon approval of a conditional use permit, a building permit and/or variance permit, construction must begin within one year or the permit shall be null and void. An applicant requesting an extension of his permit may submit a revised construction schedule to the planning department within the one-year period, with said extension not to be unreasonably withheld.
(Ord. No. 47-10, § 2, 10-5-2010) (Code 1992, § 27-703)
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.