§ 6-30 — Fee schedule
Municipal Code of the City of Fort Smith, Arkansas (Codified through Ordinance No. 126-24, enacted December 3, 2024. (Supp. No. 4)) · Fort Smith Municipal Code § 6-30
Corpus is an independent public-information project, not the official City of Fort Smith website. Stable reference: corpuslaw.us/code/5c19bb58-6714-44d2-837b-10a27284d050
Sec. 6-30. - Fee schedule.
The definition of the term "cost of construction" includes all labor, material, subcontracts, overhead, profit and other costs necessary to properly complete the job for its intended use. All building permit cost of construction valuations shall include all site work including parking lots. The minimum cost of construction valuations for new residential construction shall be as set forth in the following chart unless modified by the method as described in the next sentence: 0 | to | 1,800 square feet | = | $80.00 a square foot 1,801 | to | 2,500 square feet | = | $100.00 a square foot 2,501 | to | 3,500 square feet | = | $125.00 a square foot 3,501 and larger | = | $180.00 a square foot When a claim is made that the foregoing costs are not appropriate to the project, the owner/contractor must establish a lesser figure by using the Marshall and Swift Valuation Service report. The following fee schedule, as referred to in section 107.4 of the building code, is adopted: (1) Residential construction (Single-family and duplex, new construction, remodel, repair, additions, alterations): Cost of Construction Fee $50.00 to $500.00: $15.00 $501.00 to $1,000.00: $22.50 $1,001.00 to $1,500.00: $30.00 $1,501.00 to $2,000.00: $37.50 $2,001.00 and over: $37.50 Plus for each additional $1,000.00 valuation or fraction thereof: $1.50 (2) Nonresidential construction (Multifamily, commercial, industrial, institutional, etc., new construction, remodel, repair, additions, alterations): Cost of Construction Fee $50.00 to $500.00: $15.00 $501.00 to $1,000.00: $37.50 $1,001.00 to $1,500.00: $52.50 $1,501.00 to $2,000.00: $67.50 $2,001.00 to $10,000.00: $67.50 Plus for each additional $1,000.00 valuation: $4.50 $10,001.00 to $50,000.00: $103.50 Plus for each additional $1,000.00 valuation: $3.75 $50,001.00 to $100,000.00: $253.50 Plus for each additional $1,000.00 valuation: $3.00 $100,001.00 to $1,000,000.00: $403.50 Plus for each additional $1,000.00 valuation: $2.25 $1,000,001.00 and over: $2,536.50 Plus for each additional $1,000.00 valuation: $1.50 (3) Sign erection and repair: Same as nonresidential fee. (4) Demolition (all): $50.00 for the first 1,000 square feet of structure and $1.00 per 100 square feet after that, plus $25.00 sewer and water inspection. (5) House moving: $100.00 for the first 1,000 square feet of structure and $1.00 per 100 square feet after that, plus $25.00 sewer and water inspection. (6) Storage tanks: $50.00 per tank. (7) Foundation only: $50.00. (8) Permit cancellation: $25.00. (9) Reinspection: $50.00. (10) Temporary certificate of occupancy: $25.00 if no inspection required and $50.00 per special or additional inspections. (11) Building, electrical, mechanical, plumbing code appeals: $50.00. (12) Permit renewal: $25.00. (13) Duplicate permit card: $5.00. (14) Emergency inspection: $25.00 plus two times the inspector's salary per hour or fraction thereof for after hours inspection. (15) Plan review: When construction plans are submitted for multifamily, commercial or industrial projects in accordance with subsections 6-28(a)(2) and (3), a nonrefundable plan review fee shall be submitted with the plans. The plan review fee shall be equal to 20 percent of the building permit fee not to exceed $1,500.00. The plan review fee is in addition to the building permit fee. (16) Sidewalk assessment: a. Residential single-family and duplex (new construction, repair, additions, alterations): Construction Cost | 1988—1989 | 1990—1992 | 1993+ Up to $20,000.00 | No Assessment $20,001.00—$80,000.00 | $25.00 | $37.50 | $ 50.00 $80,001.00 and up | $50.00 | $75.00 | $100.00 b. Commercial, industrial and multifamily (new construction, repair, additions, alterations): Construction Cost | 1988—1989 | 1990—1992 | 1993+ Up to $10,000.00 | No Assessment $10,001.00—$50,000.00 | $50.00 | $75.00 | $100.00 $50,001.00—$100,000.00 | $250.00 | $375.00 | $500.00 $100,001.00—$1,000,000.00 | $500.00 | $750.00 | $1,000.00 $1,000,001.00 and over | $1,500.00 | $2,250.00 | $3,000.00
(Code 1976, § 7-14; Code 1992, § 6-30; Ord. No. 23-99, § 1, 4-20-1999; Ord. No. 108-09, §§ 1, 2, 2-1-2010; altered in 2019 recodification)
Ask a question about Fort Smith law
Corpus searches the Fort Smith sections it holds and shows the ones that match, with their citations. Free, no sign-in.
