For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 112-9 — Drainage alterations or modifications permit required

Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 112-9

Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/bd8fc5b4-427c-47db-bee0-8ab965d2ea87

Sec. 112-9. - Drainage alterations or modifications permit required.

No person, firm, corporation or business shall: (1) Alter or modify any open channel, drainage swale, detention facility, storm sewer, or other watercourse either natural or artificial where any of said facility is part of the city stormwater management system, without first submitting construction plans and supporting documentation to the city engineer for review and being issued a compliance letter. (2) Penetrate utility lines through the storm sewer system. a. A minimum of 18 inches vertical clearance for utilities crossing any existing or proposed storm sewer or below the flow line of a drainage channel is required. b. A minimum of five feet horizontal separation for utilities to be located parallel to the storm sewer system is required. The distance shall be measured edge to edge. c. In cases where it is not practical to maintain five feet of horizontal separation or 18-inches of vertical separation, the city engineer may allow a deviation on a case-by-case basis, if supported by data from the design engineer. d. Platting of new joint use utility/drainage easements is prohibited.

(Ord. No. 08:099, § 2(2.4), 12-18-2008; Ord. No. 20:040, § 1, 11-17-2020)

Ask a question about Jonesboro law

Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.