For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 113-50 — Final plat

Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 113-50

Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/676daebf-a6d7-4b41-8826-780ef478ea3e

Sec. 113-50. - Final plat.

(a) The final plat shall conform substantially to the preliminary plat as approved. (b) At least ten working days prior to the meeting at which it is to be considered, the subdivider or his representative shall submit to the Metropolitan Area Planning Commission, during normal working hours, four reproductions of the original drawings at a scale of one inch equals 100 feet or larger one reproduction of the final plat at a scale of one inch equals 200 feet. An electronic file should be transmitted to the planning office prior to deadline of submission including the engineer's plats, vicinity map and overall subdivision plan. (c) When the plat has been approved by the city planning commission, one copy shall be returned to the subdivider with the approval of the commission certified thereon for filing with the county recorder as the official plat of record. The second copy, containing the certification of the commission, shall be returned to the subdivider for his records. The other copies, containing certification of the commission, shall be returned for the use of the commission. (d) The planning commission shall approve or disapprove this final plat within 30 days. Failure of the planning commission to act on the final plat within 30 days shall be deemed approval. If the plat is disapproved, the grounds for disapproval shall be stated upon the records of the planning commission. (e) Approval of the final plat by the planning commission shall not constitute the acceptance by the public of the dedication of any streets or other public way or ground. A certificate of acceptance of dedication may be adopted by the city council and attached to copies of the approved plat before filing and recording with the circuit court clerk of the western district of the county. (f) Time limit on approval of final subdivision plan; effect of approval. Approval of the final subdivision plan shall be good for one year from the date of approval or, in the case of a final subdivision plan approved by the planning commission to be completed in two or more phases, such approvals shall be good for one year from the date of approval of the improvement construction plans of the last preceding phase of the development. Final subdivision plan approval shall confer upon applicant the following rights for the one-year period from the date of approval: (1) The general terms and conditions upon which the approval was granted shall not be changed. (2) The applicant may apply for and the planning commission may grant extension on such final subdivision plan approval for additional periods of at least one year but not to exceed a total extension of one year. (3) In the case of a subdivision of more than ten acres, the planning commission may grant the rights referred to in subsections (a), (b) and (c) of this section for such period of time longer than two years as shall be determined by the planning commission to be reasonable. (g) The final plat and plans shall show when applicable the following: (1) The names and lines of all streets and roads, alleys lines, lot lines, building setback lines, block and lot numbers, reservations, easements and any areas to be dedicated to public use or sites for other than residential use with notes stating their purpose and any limitations. Location and names of the nearest streets and/or alignments should be altered to match existing streets. Submission shall include overall vicinity map of nearest adjacent platted subdivisions at scale. (2) Sufficient data to determine readily and reproduce on the ground, the location, bearing and length of every street line, lot line, boundary line, block line and building line whether curved or straight and including true north point. This shall include the radius, central angle and tangent distance for the centerline of curved streets and curved property lines that are not the boundary of curved streets and curved property lines that are not the boundary of curved streets. (3) Profiles of all streets with natural and finished grades drawn to a scale of one inch equals 50 feet horizontal and one inch equals ten feet vertical or larger when required by the planning commission. (4) All dimensions to the nearest one-tenth of a foot and angles to the nearest minute. (5) Location and description of monuments. (6) The names and locations of adjoining subdivisions and streets and the location and ownership of adjoining unsubdivided property. (7) Date, title, name and location of subdivision, graphic scale and true north point. (8) Certificate of dedication by landowner. (9) The names and seal of the registered land surveyor, in the state, responsible for the survey and contour formation on the plat. (10) The plan shall provide for all proposed utility lines in accord with existing policies, rules or regulations of the utilities, the city or other applicable regulations, and approval of the city water and light plant as to proposed sanitary sewer, water and electric lines, shall accompany the final plan. (11) Adequate provisions for drainage of surface water shall be made by the subdivider and shown on the plan and he shall file with the city planning commission a description, specifications and drawings prepared by a registered civil engineer in the state, which shall be adequate to provide drainage for area subdivided and/or adjacent areas attached by drainage across or from such tract. The minimum size pipe used in the subdivision shall not be less than 18 inches inside diameter. If proposed subdivision is a portion of a tract which is later to be subdivided in its entirety, then a tentative master plan of the entire subdivision should be submitted with the plat of the portion first to be subdivided. (12) A development permit where required in accordance with section 113-49 as amended, before final approval of final plat. (h) A registered engineer, in the state will check the final plat for correctness, and placing his seal on drawings, charging the cost to the subdivider.

(Code 2006, § 15.08.03; Ord. No. 909, 9-19-1955; Ord. No. 1290; Ord. No. 1630; Ord. No. 1963, § 2; Ord. No. 1872, 5-21-1984; Ord. No. 1963, § 2; Ord. No. 1986, § 3; Ord. No. 07-45, 2-6-2007)

Ask a question about Jonesboro law

Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.