For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52-7 — Make-ready work/installation

Code of Ordinances of the City of Jonesboro, Arkansas (Codified through Ordinance No. 25:028, enacted September 2, 2025. (Supp. No. 16)) · Jonesboro City Code § 52-7

Corpus is an independent public-information project, not the official City of Jonesboro website. Stable reference: corpuslaw.us/code/dd52f6e4-086c-43eb-8cf4-8e1a39b17cf5

Sec. 52-7. - Make-ready work/installation.

(a) Who may perform make-ready. Make-ready work on city poles will only be performed by a qualified contractor authorized by city to perform such work. (b) Wireless provider's installation/removal/maintenance work. (1) Quality workmanship required. All of the wireless provider's installation, removal, and maintenance work, by either the wireless provider's employees or authorized contractors, will be performed at the wireless provider's sole cost and expense, in a good and workmanlike manner, and must not adversely affect the structural integrity of city's poles or other city facilities or other attaching entity's facilities or equipment. All such work is subject to the insurance requirements of section 52-25. (2) Qualified workers required. All of a wireless provider's installation, removal, and maintenance work, either by its employees or authorized contractors, shall comply with all applicable regulations specified in section 52-4(a). Wireless providers shall assure that any person installing, maintaining, or removing its small wireless facilities is fully qualified and familiar with all applicable codes, and the design specifications established by city. (3) Authorization not required for maintenance. Notwithstanding anything to the contrary in this regulation, subsequent to the original installation of a wireless provider's small wireless facilities, the wireless provider may modify or replace the small wireless facilities without obtaining prior written consent of city so long as such modification or replacement does not substantially: (a) modify the external appearance of the small wireless facility; (b) increase the load on the applicable pole beyond the loading, if any, that was established in the approved permit application; or (c) involve placement of equipment outside the area designated in the approved permit application. A wireless provider may request, and city shall timely provide, a determination as to whether a modification or replacement made subsequent to original installation deviates from the original permit sufficiently to require the issuance of a permit.

(Ord. No. 19:044, § 2(Att.), 8-20-2019)

Ask a question about Jonesboro law

Corpus searches the Jonesboro sections it holds and shows the ones that match, with their citations. Free, no sign-in.