§ 29-186 — Grading permit required
The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 29-186
Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/d8b041a9-3c0c-4287-b19c-334eb621c1c1
Sec. 29-186. - Grading permit required.
(a) Any person proposing to engage in clearing, filling, cutting, harvesting, quarrying, construction or similar activities regulated by this chapter shall apply for a Grading Permit by means of a grading permit application obtained from the city as specified in this chapter. The city shall review the submitted documentation within ten (10) working days. Grading permits shall not be issued while applications are incomplete. A landscape permit as required in chapter 15 shall be obtained from the city before constructing or expanding a vehicular use area. Additionally, a permit is required when expanding or rehabilitating a building and landscaping is required under this chapter. Except as otherwise provided in chapter 15, the responsible party shall not allow the removal of more than seven (7) trees within any given twelve-month period without first obtaining a grading permit. No land shall be altered or cleared to the extent regulated in this chapter unless approved by a permit. (b) No land alteration shall be permitted until all necessary city approval of all plans and permits, except building permit, have been issued and construction is imminent. Clearing and grading for streets and drainage improvements may be done on residential subdivisions provided the preliminary plat has been approved. In those cases where filling or cutting in areas with seven (7) or fewer trees is to be done, the area is to be graded suitable for mowing and shall be revegetated within twenty-one (21) calendar days of grading completion. If building construction has not commenced and been diligently pursued within six (6) months of grading permit issuance or as approved by appropriate city officials, then all disturbed areas must be restored in accordance per the approved landscape plan. Landscaping and tree requirements in the buffers shall be installed, unless the city official determines that the existing buffers on the site meet the landscape planting requirements of chapter 15 and zoning requirements of chapter 36 of this Code. (c) A grading permit is required for land alteration activities specified in this section. All construction work shall include appropriate drainage and erosion control measures to protect neighboring properties. All land alteration on properties within the designated floodplain requires a grading permit without exception. (d) Grading permits, which may be obtained as part of a building permit, shall be required for any of the following activities: (1) A top of hill or hillside cuts or fills greater than ten (10) feet vertical. (2) Any construction activity where the total volume of cut or fill is equal to or greater than one thousand (1,000) cubic yards. (3) Clearing or cutting of trees on property in the city except for: i. Those districts zoned agriculture and forestry (AF); ii Mining (M); and iii. Properties abutting on a collector street of two (2) acres or less zoned single- or two-family districts R1, R2, R3, R4, or R7A, and residentially zoned properties of five (5) acres or less fronting on a residential street. (e) Prior to issuance of a grading permit, a grading and drainage plan shall be submitted to and approved by the city for activities specified in subsections (d)(1), (2) and (3). (f) When the application is for a planned zoning district, conditional use permit or subdivision, a sketch grading and drainage plan shall be required in the application to the planning commission only if any of the activities specified in subsection (d) are involved. (g) Utility organizations may obtain a one-time approval from the city for all routine tree trimming and installation, maintenance, replacement and repair of fence and sign posts, telephone poles and other kinds of posts or poles and overhead or underground electric, water, sewer, natural gas, telephone or cable facilities. The approval will include a utility organization and its contractors, agents or assigns and will be permanent in nature as long as the original approved procedures are followed. However, large-scale utility projects involving clearing of areas over twenty-five (25) feet in width shall not be authorized by one-time approval of all projects. In such cases, a separate grading permit must be obtained for each project. (h) One-time approval may be obtained by public or private entities for the stockpiling of construction spoil material and concrete and asphalt rubble at particular locations for a limited time period, not to exceed six (6) months. Grading and replanting of grassed areas and trees is required upon removal of stockpile.
(Ord. No. 19,353, § 2, 7-19-05; Ord. No. 21,867, § 1, 5-19-20)
Ask a question about Little Rock law
Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.