§ 35-231 — Same—Contents

The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 35-231

Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/4f673463-922c-4e2f-aeec-03f7cf2c9b24

Sec. 35-231. - Same—Contents.

A wastewater discharge permit shall include such conditions as are deemed reasonably necessary by the CEO to prevent pass through or interference, protect the quality of the water body receiving the treatment plant's effluent, protect worker health and safety, facilitate sludge management and disposal, and protect against damage to the POTW. A. Wastewater discharge permits must contain: (1) A statement that indicates wastewater discharge permit duration, which in no event shall exceed five (5) years; (2) A statement that the wastewater discharge permit is nontransferable without prior notification to the CEO in accordance with section 35-233, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit; (3) Effluent limits, including best management practices, based on applicable pretreatment standards; (4) Self monitoring, sampling, reporting, notification, and record-keeping requirements. These requirements shall include an identification of pollutants (or best management practices) to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local law; and (5) A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law. (6) Requirements to control slug discharge, if determined by the CEO to be necessary B. Individual wastewater discharge permits may contain, but need not be limited to, the following conditions: (1) Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization; (2) Requirements for the installation of pretreatment technology, pollution control, or construction of appropriate containment devices, designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works; (3) Requirements for the development and implementation of spill/slug control plans or other special conditions including management practices necessary to adequately prevent accidental, unanticipated, or nonroutine discharges; (4) Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the POTW; (5) The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the POTW; (6) Requirements for installation and maintenance of inspection and sampling facilities and equipment, including flow measurement devices; (7) A statement that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and (8) Other conditions as deemed appropriate by the CEO to ensure compliance with this article, and state and federal laws, rules, and regulations.

(Ord. No. 19,895, § 5.2, 12-21-07)