For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-149 — Final inspection

The Little Rock City Code, Revised 1988 (Supp. No. 83: codified through Ordinance No. 22,703, enacted December 16, 2025) · Little Rock City Code § 8-149

Corpus is an independent public-information project, not the official City of Little Rock website. Stable reference: corpuslaw.us/code/1d85db42-d8b7-4474-ba72-bb9dd73cf87c

Sec. 8-149. - Final inspection.

(a) Before any electrical current shall be used upon any electrical wiring of any character, the electrical contractor or his master electrician shall notify the electrical inspector that the job is ready for final inspection. The electrical inspector shall schedule the inspection for the following workday or as soon as conditions permit. If the electrical inspector finds the installation has been constructed in accordance with the provisions of this article, he shall record approval of inspection. The approval shall state the name of the inspector and the date of the inspection. (b) When final inspections are requested, the structure shall be supplied with temporary power by the owner or electrical contractor so that all electrical components can be tested. Occupied structures or structures containing personal property will not be entered by the electrical inspector unless accompanied by the owner or the owner's representative.

(Code 1961, § 12-3(g); Ord. No. 20,971, § 14, 12-16-14)

Ask a question about Little Rock law

Corpus searches the Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.