For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18-2 — Fee schedule

Municipal Code of the City of North Little Rock, Arkansas (Codified through Ord. No. 7866, enacted Oct. 9, 2006. (Supplement No. 20)) · North Little Rock Municipal Code § 18-2

Corpus is an independent public-information project, not the official City of North Little Rock website. Stable reference: corpuslaw.us/code/995a5aff-9c12-4064-bd23-4a3c00c45a9e

Sec. 18-2. - Fee schedule.

The following are hereby established as permit fee schedules for building, electrical, plumbing and other related work in the city: (a) Commercial and industrial building permit fees (Act 474 surcharge added $.50/1000 value): (1) Permit fees: Total Valuation | Fee $100.00 and less | No fee, unless inspection required, in which case A $15.00 fee for each inspection shall be charged $101.00 to $50,000 | $30.00 for the first $500.00 up to $2000.00 plus $3.25 for each additional thousand or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000 | $162.00 for the first $50,000.00 plus $2.75 for each additional thousand or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000 | $274.50 for the first $100,000 plus $2.25 for each additional thousand or fraction thereof, to and including $500,000 $500,000.00 and up | $974.50 for the first $500,000 plus $1.75 for each additional thousand or fraction thereof. (2) Plan review fee. When the valuation of the proposed construction exceeds $500.00 and a plan is required to be submitted by 103.2 of the 1992 Arkansas Fire Prevention Code, Vol. II, a plan review fee shall be paid to the building official at the time of submitting plans and specifications for checking. Said plan review fee shall be equal to one-fourth of the building permit fee as set forth in 103.7.4, of the 1992 Arkansas Fire Prevention Code, Vol. II. Minimum fees shall be $50.00 for new construction (added square feet) and $30.00 for repair, remodels and miscellaneous permits requiring plan review. Such plan review fee is in addition to the building permit fee and is nonrefundable. (3) House moving fees ..... $50.00 Inspection fee if it is inside the city limits ..... 30.00 Inspection fee if outside city limits ..... 50.00 (4) Demolition of structure ..... 25.00 Accessory building ..... 10.00 (5) Blasting fee. In addition to insurance and bond as required in Ordinance 6328, section 5, a permit fee of $30.00 per day shall be paid. (6) Parking lot fees (impervious surface), per square foot ..... 0.03 (7) Tent permit. Flat fee of $30.00 upon proper completion of fire department approval form. (8) Swimming pools (no charge up to 4,000 gallons) ..... 40.00 (9) Fuel tanks and pumps: Each (new or replacement) ..... 40.00 (10) Miscellaneous permit fees: New towers from ground up, per foot ..... 25.00 Fences and retaining walls ..... 25.00 Satellite dishes, co-located towers, cell cites, fire alarm systems and any other miscellaneous permit, unless previously outlined, shall be set forth in the unit cost schedules set out in subsection (a)(1) above. (11) Reinspection fee. A reinspection fee of $25.00 will be charged when an additional trip is made by an inspector due to rejections, lockouts, insufficient information as to location of building or structure, work not ready for inspection, or any other cause due to neglect or failure on the part of the applicant. (12) Penalties (working without a permit). Where work for which a permit is required by the 1992 Arkansas Fire Prevention Code, Vol. II is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled, but the payment of such triple fee shall not relieve any persons from fully complying with the requirements of the 1992 Arkansas Fire Prevention Code, Vol. II in the execution of the work nor from any other penalties prescribed herein. (13) Copy fees: Duplicate permit cards (lost, stolen, misplaced, etc,), per card ..... 5.00 Copier fees: Per copy for first 25 ..... 0.50 Per copy for additional copies ..... 0.25 Duplicate copy of certificate of occupancy ..... 10.00 (14) Board of appeals applications (building or electrical). A flat fee of $75.00 shall be included with each board of adjustments or housing and building application. (15) Expiration of permits. All permits issued by the building official shall expire one year from the date of issuance or as restricted by the Building Code. Extensions of up to 90 days after the expiration date may be granted for each permit. The request for extension must be in writing to the building official and must show just cause. A fee of $30.00 shall be assessed for each 90-day extension. (16) A permittee holding an unexpired permit may apply for a one-time extension, provided he can show good satisfactory reason, and beyond his control the work cannot be commenced within the six-month period from the issue date. In order to renew work on a permit after it has expired, the permittee shall pay a fee in accordance with subsection (a)(2) above. Permittee shall pay a new, full permit fee in cases of change in contractor. (b) Residential building permit fees. (1) Permit fees: Total Valuation | Fee $100.00 and less | No fee, unless inspection required in which case a $15.00 fee for each inspection shall be charged $101.00 to $50,000.00 | $30.00 for the first $500 up to $2,000 plus $2.75 for each additional thousand or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 | $162.00 for the first $50,000.00 plus $2.25 for each additional thousand or fraction thereof, to and including $100,000.00. $100,001.00 to $500,000.00 | $274.50 for the first $100,000.00 plus $2.25 for each additional thousand or fraction thereof, to and including $500,000.00 $500,001.00 and up | $974.50 for the first $500,000.00 plus $1.75 for each additional thousand or fraction thereof. (2) Demolition of structure ..... 25.00 (3) Swimming pools (no charge up to 4,000 gallons) ..... 40.00 (4) Fences ..... 15.00 (5) Reinspection fee. A reinspection fee of $25.00 will be charged when an additional trip is made by an inspector due to rejections, lockouts, insufficient information as to location of building or structure, work not ready for inspection, or any other cause due to neglect or failure on the part of the applicant. (6) Penalties (working without a permit). Where work for which a permit is required by the 1992 Arkansas Fire Prevention Code, Vol. II is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled, but the payment of such triple fee shall not relieve any persons from fully complying with the requirements of the 1992 Arkansas Fire Prevention Code, Vol. II in the execution of the work nor from any other penalties prescribed herein. (7) Copy fees: Duplicate permit cards (lost, stolen, misplaced, etc.), per card ..... 5.00 Copier fees: Per copy for the first 25 ..... 0.50 Per copy for additional copies ..... 0.25 Duplicate copy of certificate of occupancy ..... 10.00 (8) Board of adjustment applications (building or electrical). A flat fee of $75.00 shall be included with each board of adjustments or housing and building application. (9) Expiration of permits: a. All permits issued by the building official shall expire one year from the date of issuance or as restricted by the Building Code. Extensions of up to 90 days after the expiration date may be granted for each permit. The request for extension must be in writing to the building official and must show just cause. A fee of $30.00 shall be assessed for each 90-day extension. b. A permittee holding an unexpired permit may apply for a one-time extension, provided he can show good and satisfactory reason, and beyond his control the work cannot be commenced within the six-month period from the issue date. In order to renew work on a permit after it has expired, the permittee shall pay a fee in accordance with subsection (3) above. Permittee shall pay a new, full permit fee in cases of change in contractor. (c) Electrical permit fees. (1) New construction: One and two family dwellings, per square foot under roof ..... 0.05 All other occupancies ..... As set forth in the unit cost schedules in subsection (b)(3) above. (2) Repair/addition to existing construction: As set forth in the unit cost schedules in subsection (b)(3) above. (3) Various fees: Meter loops: First ..... 12.00 Additional ..... 6.00 Load centers (regardless of voltage): Up to 60 amp ..... 7.00 Up to 100 amp ..... 14.00 Up to 150 amp ..... 22.00 Up to 200 amp ..... 30.00 Over 200, per 100 amp over 200 amp ..... 4.50 Openings: One to ten ..... 5.50 11 to 20 ..... 10.00 21 to 40 ..... 17.50 41 to 60 ..... 22.50 61 to 80 ..... 26.50 81 to 100 ..... 28.50 101 to 200 ..... 46.00 201 to 300 ..... 58.00 301 to 400 ..... 66.50 Over 400, for each 25 over 400 ..... 4.00 Motor and generator wiring: One-eighths to one H.P. or K.W. ..... 4.00 Two to four H.P. or K.W. ..... 7.00 Five to ten H.P. or K.W. ..... 10.50 11 to 15 H.P. or K.W. ..... 13.50 16 to 20 H.P. or K.W. ..... 16.50 21 or over H.P. or K.W. ..... 20.00 Fraction horsepower motors can be grouped for their total horsepower and paid for as one unit. Temporary construction meter ..... 15.00 Temporary power to building ..... 18.00 Outside electrical signs ..... 15.00 Electrical window signs ..... 15.00 Neon borders, window or outside ..... 15.00 Sign boards, regular permit ..... 5.50 Rectifiers ..... 13.50 Smoke detectors, each ..... 4.00 For inspection purposes smoke detectors may be grouped in a ratio of five detectors to one inspection provided that all detectors are ready for inspection at the same time and are located in the same structure. Motion picture machines ..... 12.00 Electric stoves, ranges, dryers, water heaters ..... 12.00 X-ray machines ..... 12.00 Vent hoods/bath fan/exhaust fan ..... 4.00 Dishwashers/trash compactors ..... 4.00 Disposals/ceiling fans ..... 4.00 Electric heat: One to 15 K.W. ..... 5.50 16 to 25 K.W. ..... 9.50 Special circuits such as window air conditioners: 20 to 30 amp ..... 6.50 30 to 60 amp ..... 8.50 Special equipment per 1,000 watts ..... 3.00 Festoon or temporary decorative lights: Outdoor sales and display lights: Meter loop ..... 12.00 Each circuit ..... 12.00 Each 50 Lamps ..... 3.00 Inspections (each) ..... 15.00 As per conditions of subsection (a)(9) above ..... 20.00 Reinspections (each) ..... 25.00 As per conditions of subsection (a)(10) above ..... 15.00 (4) Examinations: Renewal fee: Master electrician ..... 35.00 Journeyman electrician ..... 20.00 Specialist refrigeration electrician ..... 15.00 Supervising air conditioning electrician ..... 15.00 Air conditioning electrician ..... 15.00 Air conditioning maintenance electrician ..... 15.00 Specialist sign electrician ..... 15.00 Maintenance electrician ..... 15.00 Examination: Supervising air conditioning electrician ..... 30.00 Air conditioning electrician ..... 25.00 Air conditioning maintenance electrician ..... 25.00 Specialist sign electrician ..... 25.00 Homeowner: Examination fee ..... 25.00 (5) Temporary power requirements. Before any power is supplied to the permanent distribution system of a building under construction, written notice must be submitted to this office noting the length of time the temporary power will be needed before the final electrical inspection is made, the understanding that the structure will not be occupied until after the final inspection, and that the party submitting the request will assume liability of any damage incurred as a result of disconnection of power from the building as a result of a violation of this ordinance. The time limit on temporary power being furnished to the building will be determined on the basis of need, not to exceed 30 days. An extension of time may be granted only by special permission. (6) Expiration of permits as per conditions of subsection (a)(22) above. (7) Minimum permit shall be $30.00. (8) Work with no permit. In case it shall be discovered that any electrical work has been installed or put into use for which no permit has been issued, the violator shall pay a fee equal to three times the permit fee which shall have been paid for work done in violation thereof and no additional permits shall be granted until all fees have been paid. (d) Plumbing permit fees. (1) New construction: One- and two-family dwellings, per square foot under roof ..... 0.05 All other occupancies ..... As set forth in the unit cost schedules in subsection (2) below (2) Repair/alterations/addition to existing construction: Unit costs, each plumbing fixture outlet or appliance ..... 4.00 Shall include each water closet, urinal, bidet, sink, lavatory, basin, laundry sink, wash tray, dishwasher, garbage disposal, ice maker, beer or soda fountain, bath tub, hot tub, shower, sauna, drinking fountain, wet bar, washing machine, hose cabinet or hose rack, fire pump, sewer ejector, cooling tower, sill cock, dental unit, hub drain, floor, area or roof drain, sand trap, grease trap, sump pump or any other plumbing element commonly known as plumbing fixture. Water service ..... 25.00 Lawn sprinkler service ..... 25.00 Water house piping ..... 12.00 Swimming and wading pools ..... 12.00 Renewal of soil, waste or vent lines (each branch or stack) ..... 5.50 Gas service (up to five meter openings) ..... 15.00 Gas house piping (up to five openings) ..... 15.00 Each additional opening ..... 3.00 Each gas-fired appliance ..... 13.00 Shall include each water heater, floor furnace, unit heater, vented wall furnace, commercial clothes dryer, commercial range or oven, or other gas fired appliance not specifically mentioned excluding portable heating stoves and space heaters Domestic gas-fired appliance—Ranges, clothes dryer ..... 3.00 Renewal of gas-fired appliance vent ..... 5.00 Inspections (each) ..... 15.00 Reinspections (each), as per conditions of subsection (a)(16) above ..... 25.00 Investigative inspections (each), as per conditions of subsection (a)(14) above ..... 30.00 (3) Expiration of permits as per conditions of subsection (a)(22) above. (4) Work located out of city limits shall be charged a surcharge of 50 percent of total permit charge. (5) Minimum fee for any permit shall be $30.00 (6) Work with no permit. The penalty for failure to obtain a permit for work as called for in this Code shall be as described in the penalty section of this Code, and in addition to any such fine or imprisonment as may be imposed pursuant to said penalty section, the violator shall pay a fee equal to three times the permit fee which shall have been paid for work done in violation hereof. (e) Heating/air mechanical permit fees. (1) New construction: One- and two-family dwelling, per square foot ..... 0.05 All other occupancies ..... As set forth in the cost schedules in subsection (2) below. (2) New commercial, replacements, repairs, alterations and additions. Heating, ventilating, ductwork, air conditioning, boilers, and refrigeration systems shall be $30.00 for the first $500.00 up to $1,000.00 or fraction thereof, of valuation of the installation plus $3.00 for each additional $1,000.00 or fraction thereof. (Boiler permits only issued with proof of special boiler license.) Inspections (each) ..... 15.00 Reinspections (each) ..... 25.00 Investigative inspections (each) ..... 30.00 (3) Minimum fee for any permit shall be $30.00 (4) Expiration of permits as per condition of subsection (a)(22) above. (5) Penalties (working without a permit). Where work for which a permit is required by the 1991 Arkansas Mechanical Code is started or proceeded prior to obtaining said permit, the fee herein specified shall be tripled; however, payment of such triple fee shall not relieve any person from fully complying with the requirements of the 1991 Arkansas Mechanical Code in the execution of the work nor from any penalties prescribed herein and no additional permits shall be granted until all fees have been paid. (f) Minor repairs made by owner exempted. (1) No building, electrical, or plumbing permits shall be required for home repairs per existing housing structure which occur within a 90-day period, when such repairs cost less than $2,500.00 and are repaired by the owner of the structure. This provision shall apply to all homes regardless of whether or not they are homeowner occupied. This provision of the Code is not meant to exempt any person from complying with state law. (2) However, a permit is still required for licensed bonded electrical contractors who must perform all work other than branch circuits. (g) Special permit fees. All residential building, electrical and plumbing fees in the designated target area as represented by Exhibit A attached to Ordinance No. 7421 shall be reduced by 75 percent of the permit fees outlined in Ordinance No. 7240 when residential use shall compose more than 50 percent of the building. (h) Historic districts. The permit fees listed in this section shall not apply to work that is performed within any area of the city designated as a local historic district.

(Ord. No. 7240, § 1, 8-23-99; Ord. No. 7299, § 1, 8-28-00; Ord. No. 7421, § 1, 12-26-01; Ord. No. 7568, § 1, 7-28-03)

Ask a question about North Little Rock law

Corpus searches the North Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.