§ 94-55 — Construction methods
Municipal Code of the City of North Little Rock, Arkansas (Codified through Ord. No. 7866, enacted Oct. 9, 2006. (Supplement No. 20)) · North Little Rock Municipal Code § 94-55
Corpus is an independent public-information project, not the official City of North Little Rock website. Stable reference: corpuslaw.us/code/7188d20e-4e97-4108-9a2b-2448b9135383
Sec. 94-55. - Construction methods.
(a) Excavation for concrete sidewalks shall be brought to a subgrade four inches below the finished grade of the walk. (b) Excavation for curbs and gutters shall be brought to a subgrade to meet the bottom of the gutter. (c) Backfill for the subgrade of sidewalk or curb and gutter shall be made with suitable materials and thoroughly compacted to afford a solid foundation. The subgrade shall be dampened before pouring the concrete. (d) Forms shall be on such materials as will give the required rigidity to maintain the established alignment and grade. Upon completion of the sidewalk and/or curb and gutter, the contractor shall remove all debris, construction materials and excess excavated materials from the street. (e) The area between the gutter and the existing street shall be backfilled and compacted by the contractor. The curb shall be backfilled by the contractor with the excavated materials from the curb and gutter excavation. (f) The contractor shall maintain the necessary barricades and lights for protection of the public until the curb and gutter and/or sidewalk are constructed and backfilling is completed.
(Code 1980, § 29-64)
Ask a question about North Little Rock law
Corpus searches the North Little Rock sections it holds and shows the ones that match, with their citations. Free, no sign-in.