§ 18-97 — Procedure for construction plan approval
Code of Ordinances of the City of Springdale, Arkansas (Codified through Ordinance No. 6214, enacted May 4, 2026. (Supp. No. 145)) · Springdale Code of Ordinances § 18-97
Corpus is an independent public-information project, not the official City of Springdale website. Stable reference: corpuslaw.us/code/ba0bacf2-8e8f-4997-a9b9-e19f7f3a7278
Sec. 18-97. - Procedure for construction plan approval.
Licensees for commercial aeronautical activity at the municipal airport shall follow the following procedure for approval of construction plans: (1) Preparation of plans. All plans and specifications for buildings or structures to occupy space obtained through the airport commission shall be prepared in accordance with section 112-8 of the Code of Ordinances of the City of Springdale, Arkansas. (2) Applicability. The provisions of this section shall apply to all developments proposed within the property limits of the Springdale Municipal Airport with the following exemptions: a. Interior renovation or construction that does not affect the exterior appearance of buildings; and b. Exterior repairs or replacements that do not exceed 50 percent of the exterior appearance or material of the building as of the effective date of the adoption of these standards. (3) Application process. a. Letter of intent. Prior to the submission of a large scale/non-large scale development plan, as outlined above, a letter of intent must be submitted to the airport commission expressing the applicant's desire to lease land from the City of Springdale at the Springdale Municipal Airport to construct a hangar or other structure in accordance with all applicable city, state and federal requirements subject to the submission requirements as follows: 1. Conceptual/pre-design meeting. A conceptual/pre-design meeting must be held prior to the submission of the letter of intent. The applicant shall meet with the Chairman of the Springdale Municipal Airport Commission, Airport manager, and city planning and engineering staff. The applicant shall provide preliminary drawings and concepts sufficient for an informal review and discussion. 2. Submission requirements. Following a conceptual/pre-design meeting the letter of intent, along with preliminary drawing and concepts, shall be submit to the airport commission to the city clerk at least 15 days prior to a meeting of the airport commission at which consideration is requested. 3. The airport commission will in writing advise the licensee as promptly as possible of the extent to which the proposed building or structure conforms to the requirements of the Springdale Municipal Airport master plan, the city planning commission, and other city, county, state and federal agencies that may be associated with the development of the airport, and will discuss possible modification if necessary to secure conformance; provided, further, that all prospective airport tenants and licensees shall submit to the Federal Aviation Administration prior to commencement of any construction a "Notice of Proposed Construction or Alteration" on FAA Form 7460-1 as required by Part 77 of the Federal Aviation Regulations. b. Airport commission approval. The letter of intent and conceptual design must be approved by the Springdale Municipal Airport Commission prior to submission of a development plan as outlined in section 112-8. c. Submission of development plan. Submission of the development plan shall be made in conformance with the provision of section 112-8 of the Code of Ordinances of the City of Springdale. d. Planning commission approval. The review and approval of the development shall be as outlined in section 112-8. Following approval, a copy of the approved plans will be forwarded to the airport commission for development of the necessary lease agreements. e. Variances. The planning commission, acting as the board of adjustment as provided in section 90-30 of the Code or Ordinances of the City of Springdale, will review all variance and waiver requests of this section following the procedures outlined in section 112-8 of the Code of Ordinances after consideration of recommendations from the Airport Commission. (4) Springdale Airport design standards. The design standards in this section are intended to implement the City of Springdale's vision for the highest quality development on the property of the Springdale Municipal Airport (ASG). The intent of standards is to improve the overall quality and compatibility of municipal airport development with those of the surrounding city, as well as enhance airport safety with the following guiding principles: • Development and land use must have a strong emphasis on aviation related activities; • Development and design must emphasize and ensure safe movement of aircraft for hangar ingress and egress; • Development should be located to achieve maximum efficiency of land utilization; and • Structures and buildings should feature a common appearance using compatible and complimentary design principles. a. Building compatibility. All airport buildings and structures shall be designed in a manner compatible with the materials, color, scale, size, proportion, and massing of other structures in the surrounding vicinity. All airport buildings and structures directly facing the exterior of the airport property shall feature at least one common element of color (see exterior color palettes identified below) or material among all other structures that face all other exterior facades of the airport. b. Building frame. The frame of the building or structure must be steel, and must meet current building code and the minimum standards of the Arkansas State Department of Aeronautics, whichever is more restrictive. c. Building height. All buildings and structures shall comply with the maximum height regulation(s) established by FAA standards for regulating airspace in the vicinity of runways. d. Roofs. Roof pitch of individual or multi-unit hangar buildings shall be a minimum of 2:12 slope (rise/run) up to a maximum of 4:12 slope. Roof shape must be either gable, round, shed or Quonset. Any variance to roof pitch will be processed through the standard variance procedure as outlined herein. e. Building size and shape. All hangars shall be a minimum of 2,500 square feet per unit. All building and structure footprints must be square or rectangular for maximum space efficiency. All buildings and structures must have vertical walls. Buildings and structures must be consistent in size to preserve sight lines of the airfield from all surrounding visibility. f. Doors. Doors must be metal and produced by an aviation door manufacturer. Overhead doors are prohibited from all facades or walls directly facing the surrounding exterior properties. g. Exterior materials. The front, rear, and sides of all buildings and structures shall be constructed with materials approved by the City of Springdale's Commercial Design Standards. Builders are encouraged to use sustainable materials, when possible. 1. Generally. With the exception of facades facing the surrounding exterior properties, which are subject to specific requirements in this section, materials may include metal, masonry, aluminum, glass, concrete, hardi board, translucent panels, synthetic stucco, and steel or a combination thereof. Building glazing shall not cause glare or reflectors that will interfere with airport operations or ground circulation. If synthetic stucco is used on any side of the building, the maximum allowable coverage for that side is ten percent and cannot be used below four feet above base of the building or structure. Metal exterior siding must be a minimum of 26 gauge. 2. Facades fronting Highway 265, Highway 412, Emma Avenue, Powell Street. Use of metal material on the façade facing the streets listed above may not exceed 50 percent of the wall area. 3. Interior airport facades. Facades located on interior portions of airport property that face the streets listed above shall not be applicable for façade upgrades if the airport commission decides that future hangar development will shadow the exterior facing façade. 4. Compatibility: The architectural design and style of a building shall be carried throughout the building and shall match on all sides of the building. h. Exterior colors. Exterior colors shall utilize primarily muted, neutral, or earth tone colors. Builders must choose from a set of four pre-approved color palettes, which will be made available to all prospective builders. The selected color palette shall be provided with all plan submittals. i. Floors. All hangar floors must be constructed with finished concrete that is impermeable to water seepage. j. Insulation. For all fully enclosed T and Box hangars, interior insulation is required, including hangar doors when applicable. k. Utility and mechanical equipment screening. All exterior mechanical equipment, including roof mounted equipment, must be screened from view from surrounding exterior properties with similar building materials. l. Setbacks. The Springdale Airport Commission will determine setback distances for construction based on FAA regulations, airport layout plan and other airport regulations that may be enacted from time to time. No part or portion of any building shall be erected, constructed, or extended into any setback area. No building construction equipment or materials shall be staged, placed, or operated in a manner that impedes the movement of aircraft along taxi lanes or taxiways. No variances from the provisions of this section shall be permitted. m. Parking. Parking spaces may be constructed at builder's discretion with the approval of the airport commission and must be included in the leased ground area. Parking spaces shall not be placed on the active side of the hangar where aircraft movement could be compromised. Parking areas must be developed with a dust-proof/all-weather surface. n. Landscaping. Builders will be required to contribute to a common airport landscape fund based on a fee established by the airport commission and used for the sole purpose of establishing and maintaining a unified landscaping area in and around the airport property. o. Barriers to entry. A "barrier to entry" will be established with each project to provide separation between aircraft movement areas and other areas of airport property. A "barrier to entry" fee in lieu of the barrier may be approved for special circumstances by the airport commission in which constructing the barrier is not practical during the building project. (5) Airport commission action. Within 90 days after acceptance for review of the preliminary plans and specifications by the airport commission, it shall indicate in writing its approval, disapproval or approval with condition. Failure of the airport commission to act on the preliminary plans and specifications within 90 days of its acceptance will be deemed approval of the plans and specifications. Approval, approval with conditions or disapproval of the preliminary plans and specifications by the airport commission shall be noted, both upon the preliminary plans and the airport commission records.
(Code 1973, § 3-48; Ord. No. 5871, § 1, 8-8-23)
Ask a question about Springdale law
Corpus searches the Springdale sections it holds and shows the ones that match, with their citations. Free, no sign-in.
