8-64 - Requirement for new development projects to submit stormwater pollution prevention plans; construction permit issuance; fees.
(a) Any entity applying for a permit, authorization, license, or permission for construction activity that will disturb one (1) or more acres of land shall prepare a stormwater pollution prevention plan (SWPPP) for the management of stormwater discharges from the proposed construction site. The applicant shall refer to Volume III - Erosion Control of the Drainage Design Manual by the Flood Control District of Maricopa County, as amended, for guidance in developing the SWPPP. The SWPPP must indicate the addresses of all Maricopa County parcel numbers of all affected properties. In addition to what is required by the construction general permit to be included in the SWPPP, the SWPPP shall include, at a minimum: (1) The total area of the site, an estimate of the total area of the site expected to be disturbed and a description of the intended sequence of activities that will disturb soils at the construction site. (2) A legible site map, showing the entire site that identifies: (i) Directions of stormwater runoff and the type and location of the measures intended to manage the runoff, as applicable. (ii) Areas of soil disturbance. (iii) Construction material, waste, borrow, or equipment storage areas. (iv) Locations where stormwater discharges to the ms4 and/or waters of the state could occur. (v) Current and proposed locations of on-site drywells. (3) A description of both structural and non-structural best management practices to be implemented and maintained at the construction site. Any post-construction stormwater management measure to be installed or completed during the construction period shall be designed and installed consistent with the city's general engineering requirements, and meet all applicable authorization and management requirements under state and federal law. (4) A description of final construction site stabilization to be performed, including stabilization of slopes, vegetation, ground cover and permanent drainage features. (5) The plans for the management of construction waste and sanitary waste. (6) Detailed plans for the use, storage, handling, and disposal of hazardous substances as defined in Arizona Revised Statues § 49-201, as amended. (7) Detailed plans for the maintenance of stockpiled materials and measures to prevent the erosion and transport of stockpiles by stormwater. (8) The statement and signature by a qualified individual certifying the accuracy and completeness of the SWPPP. A qualified individual includes any of the following: (i) Certified professional in erosion and sedimentation control (CPESC). (ii) Certified professional in storm water quality (CPSWQ). (iii) Registered professional engineer (civil, agricultural, or environmental) in the State of Arizona with a minimum of five (5) years of design and/or management experience in stormwater permitting/compliance work. (b) The applicant shall provide an accurate and complete SWPPP to the NPDES coordinator for review before a construction permit is issued by the city. In cases where an application is submitted for a grading permit, such permit shall not be issued until the NPDES coordinator has reviewed and approved the best management practices and the permit shall be made conditional upon compliance with the best management practices. If the NPDES coordinator determines that the SWPPP is inadequate to prevent sediment from reaching waters of the United States, adjacent property, or the public right-of-way, the NPDES coordinator may authorize and require additional best management practices or and/or configurations thereof. Along with the SWPPP, the applicant shall submit to the NPDES coordinator the following: (1) A copy of an accurate and complete (including signature) NOI issued to the permitting authority to seek coverage under the construction general permit, or in lieu of this, a copy of the letter or confirmation document from the permitting authority regarding authorization status. (2) A copy of the Maricopa County Rule 310 (air permit) application approval for the project. (C) Fees for SWPPP review and for review and approval of best management practices for grading permits shall be established by the city council as part of the annual budget process or as otherwise adopted by city council resolution. (Ord. No. 1188-606, § 2, 6-5-06; Ord. No. 1673-1018, § 3, 10-15-18)