For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.08.140 — General industrial user requirements

Municipal Code of the City of Bullhead City, Arizona (Codified through Ordinance No. 2026-14, enacted August 17, 2026. (Supp. No. 75)) · Bullhead City Municipal Code § 13.08.140

Corpus is an independent public-information project, not the official City of Bullhead City website. Stable reference: corpuslaw.us/code/7197aab2-e7dc-4594-808a-13df5bce8c0b

13.08.140 - General industrial user requirements.

All industrial users shall: A. Comply with the categorical standards, pretreatment requirements, and all other requirements imposed by this chapter upon POTW users; B. Comply with the orders of the utilities department designed to implement the categorical standards, pretreatment requirements, and all other requirements imposed by this chapter; C. Within ninety days of the adoption of the ordinance codified in this chapter, and prior to the discharge of wastewater to the POTW by any new user thereafter, file a written notice with the utilities department which identifies the: 1. Name and address of the existing prospective users, 2. Business location(s) served or to be served by the POTW, 3. Nature, concentration and amounts of any substance present at or intended to be present at such location(s) which, if discharged to the POTW, could constitute an industrial discharge, 4. Nature and concentration of all pollutants currently discharged to the POTW from such business location(s); D. File an annual POTW user report with the utilities department by the first of January of each year which provides an update to the information obtained pursuant to subsection C of this section. This reporting requirement does not apply to industrial users operating pursuant to an industrial user permit; E. Carry out, and maintain an adequate record of, self-inspection and self-monitoring activities necessary for the user to know at all times whether or not such user is introducing any industrial discharge to the POTW; F. Assist the utilities department to determine the exact nature, concentration, and volume of any pollutant intended for discharge to the POTW. Therefore, upon request, any industrial user shall promptly: 1. Allow the examination and copying of all relevant records or documents available to the user, 2. Allow the inspection of all business locations served by the POTW, including all pretreatment equipment, methods, and activities utilized by the user at such locations, 3. Install and maintain, at the user's expense, convenient and adequate monitoring and/or sampling point(s) needed by the utilities department for monitoring and/or sampling purposes, 4. Allow the taking and removal of samples from any wastewater discharged or intended for discharge to the POTW, 5. Provide the utilities department with any other information, including, but not limited to, chemical analyses of wastewater and architectural or engineering design data, drawings, etc., which may be reasonably needed by the utilities department for the purpose of determining such user's compliance with the requirements of this chapter; G. Not cause an industrial discharge without having first obtained, or applied for, an industrial user permit pursuant to the requirements of this chapter; H. Comply with the demand of the utilities department to immediately halt any actual or threatened discharge to the POTW when the utilities department has given notice that such actual or threatened discharge: 1. Presents or may present an imminent or substantial endangerment to the health or welfare of any person or to the environment, or 2. Will cause interference with POTW operations; I. Immediately give notice to the utilities department of any discharge, including an accidental discharge, which is in violation of any categorical standard, pretreatment requirement, city regulation or permit condition imposed by this chapter. Such notice shall describe the: 1. Location of the discharge, 2. Known or estimated nature, concentration, and volume of the discharged pollutant(s), 3. Type of assistance desired from the city, 4. Corrective action(s) undertaken, being undertaken, and/or to be undertaken by the user. Any user causing such a discharge shall also initiate all appropriate corrective action(s) required by the utilities department which are needed to: i. Prevent any further injury to human health or safety or to the environment, the POTW, and/or any other property, ii. Promptly repair all or part of any injury or damage caused by such discharge, and iii. Ensure that such a discharge does not occur again; J. Pay all sewer fees charged by the city for the wastewater collection and disposal services provided by the POTW pursuant to the requirements of this chapter. Such service fees will apply equally to all POTW users and will be determined by each user's proportionate share of the POTW operating and maintenance costs. In turn, the proportionate share will be based on such factors as the strength, volume and flow rate of wastewater discharged to the POTW by each user; K. Reimburse the city for all extraordinary expenses reasonably incurred by the city in ensuring such POTW user's compliance with the applicable requirements of this chapter. An extraordinary expense is any cost not otherwise reimbursed from the normal collection of sewer fees. Therefore, extraordinary expenses include, but are not limited to, the costs in: 1. Issuing permits, 2. Conducting inspection, surveillance, and monitoring activities, 3. Obtaining laboratory analyses of waste samples, 4. Taking enforcement actions against users not in compliance with the requirements of this chapter, and 5. Carrying out any measure needed for the protection of human health or safety, the environment, the POTW, or any other property in order to correct or mitigate any harm caused by the violation of any categorical standard city regulation or pretreatment requirement; L. Be financially responsible for all injury, damage, and/or loss suffered by any person as a result of any industrial discharge by such user, which violates any categorical standard, pretreatment requirement, city regulation or permit condition enforced pursuant to this chapter. In particular, such user shall be liable for the: 1. Personal injury suffered by any persons as a result of such discharge, 2. Costs reasonably incurred by any person in correcting, or otherwise mitigating, any adverse environmental impact which resulted from such discharge, and 3. Economic loss and property damage suffered by any person as a result of such discharge.

(Ord. No. 2021-15, § 1, 8-24-2021)

Ask a question about Bullhead City law

Corpus searches the Bullhead City sections it holds and shows the ones that match, with their citations. Free, no sign-in.