For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 52-26 — Water buy-in assessments

Code of the City of Chandler (Supp. No. 80: codified through Ordinance No. 5171, adopted July 13, 2026) · Chandler City Code § 52-26

Corpus is an independent public-information project, not the official City of Chandler website. Stable reference: corpuslaw.us/code/cfb5f11c-1234-4aa9-a169-caa69055e4f3

52-26. - Water buy-in assessments.

A. Water buy-in assessments as described below shall be paid by the developer before the final plat, map of dedication, or horizontal property regime is approved; except that in the case of site development plans, the buy-in assessment shall be paid prior to approval of the site development plans. Buy-in assessments not covered by the foregoing shall be paid with the water meter installation fee as described in Chapter 50. B. Any developer developing property which abuts an existing water main(s) shall pay to the City half the front foot current cost of the largest existing main abutting each side of the property (up to a maximum of sixteen-inch diameter) whether or not the developer desires to connect a service to the main or desires to extend a new main in a lateral manner with a connection to the main. In those cases where a main dead ends perpendicular to a property frontage or parallels only a portion of the frontage, the entire frontage or forty-five (45) feet, whichever is greater, will be used to compute the buy-in assessment. This provision shall not apply to stub-outs provided for future main extensions. C. One hundred (100) percent of the front foot current cost of said main shall be paid when special conditions will not permit service to property located on both sides of the main when recommended by the City Engineer and approved by the City Council. D. When the developer installs a water main, that developer is exempt from payment of the front foot current cost buy-in assessment for any existing main on the side of the property on which the developer installs the new main, providing that the new main is equal to the line size noted in the master plan and runs for the total length of the developer's property.

(Ord. No. 1989, § 2, 8-22-88; Ord. No. 3060, § 2, 11-18-99)

Ask a question about Chandler law

Corpus searches the Chandler sections it holds and shows the ones that match, with their citations. Free, no sign-in.