§ 15.20.11 — Amendments to the International Mechanical Code

Municipal Code of the City of Cottonwood, Arizona (Codified through Ordinance No. 767, passed April 21, 2026. (Supp. No. 26, (8/26), Update 2)) · Cottonwood Municipal Code § 15.20.11

Corpus is an independent public-information project, not the official City of Cottonwood website. Stable reference: corpuslaw.us/code/0622476e-9df3-4e0e-a340-2d5b978c2934

15.20.11 - Amendments to the International Mechanical Code.

The International Mechanical Code is amended as follows: A. Section 101.1, Title, is amended to read as follows: 101.1: Title. These regulations shall be known as the Mechanical Code of the City of Cottonwood, hereinafter referred to as "this code." B. Section 111.2, Required inspections and testing, is amended to read as follows: 111.2: Required inspections and testing. The code official, upon notification from the permit holder or the permit holder's agent, shall make the following inspections and other such inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or the permit holder's agent of violations that must be corrected. The holder of the permit shall be responsible for the scheduling of such inspections. 1. Underground inspection shall be made after trenches or ditches are excavated and bedded, piping installed, and before backfill is put in place. Where excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site. 2. Rough-in inspection shall be made after the roof, framing, fireblocking and bracing are in place and all ducting and other components to be concealed are complete, and prior to the installation of wall or ceiling membranes. 3. Final inspection shall be made upon completion of the mechanical system. 4. Where necessary to verify compliance with this code, a test and balance report(s), performed by a third party, certified test and balance contractor, shall be submitted to the City prior to final inspection. Said test and balance report(s) shall verify compliance of any newly installed or altered ventilation and/or exhaust system with the approved permit plans, the mechanical code and any applicable standards. The building official may waive the requirement for testing if the construction is of a minor nature. Exception: Ground-source heat pump loop systems tested in accordance with Section 1210.10 shall be permitted to be backfilled prior to inspection. The requirements of this section shall not be considered to prohibit the operation of any heating equipment or appliances installed to replace existing heating equipment or appliances serving an occupied portion of a structure provided that a request for inspection of such heating equipment or appliances has been filed with the department not more than 48 hours after such replacement work is completed, and before any portion of such equipment or appliances is concealed by any permanent portion of the structure. C. Section 115.2, Issuance, is amended to read as follows: 115.2: Issuance. The stop work order shall be in writing and shall be given to the owner of the property, the owner's authorized agent or the person performing the work. Posting of the stop work order on the structure or property in question shall be deemed proper notification to the owner or owner's authorized agent. Upon issuance of a stop work order, the cited work shall immediately cease. The stop work order shall state the reason for the order and the conditions under which the cited work is authorized to resume. D. Section 506.3.2.5, Grease duct test, is amended to read as follows: 506.3.2.5: Grease duct test. A field test shall be performed prior to the use or concealment of any portion of a grease duct system. Grease ducts shall be considered to be concealed where installed in shafts or covered by coatings or wraps that prevent the grease ducts from being visually inspected on all sides. The permit holder shall be responsible to provide the necessary equipment and perform the grease duct leakage test. A light test shall be performed to determine that all welded and brazed joints are liquid tight. A test shall be performed for the entire grease duct system, including the hood-to-duct connection. The grease duct system shall be permitted to be tested in sections, provided that every joint is tested. For listed factory-built grease ducts, this test shall be limited to duct joints assembled in the field and shall exclude factory welds. The test shall be performed in accordance with either Section 506.3.2.5.1, 506.3.2.5.2, or 506.3.2.5.3. Section 506.3.2.5, Grease duct test, is amended to add Section 506.3.2.5.1, Positive pressure smoke test, to read as follows: 506.3.2.5: Positive pressure smoke test. A duct test shall be performed by sealing the entire duct system from the hood exhaust opening(s) to the duct termination. Thick penetrating smoke shall be produced by one or more smoke machines or smoke bombs and introduced into the duct system. The sealed duct shall then be pressurized to a minimum pressure of 1.0 inch water column, but shall not exceed the positive pressure capability of the system and components under test. If the test shows any evidence of leakage or other defects, such defects shall be corrected and the test shall be repeated until there is no visible smoke observed. Materials or chemicals used for smoke testing should not be corrosive to the duct. Smoke generating equipment containing chlorine or chlorinated chemicals must not be used.

(Ord. No. 761, § 14, 5-20-2025)