For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 196 — New Construction, Additions and Remodel Existing Building Permits

City Code of the City of Phoenix, Arizona (Phoenix City Code current through Ordinance G-7524, passed June 17, 2026 (municipal.codes publication, scraped 2026-11-17)) · Phoenix City Code § 196

Corpus is an independent public-information project, not the official City of Phoenix website. Stable reference: corpuslaw.us/code/0c642cc2-1bc7-4815-bd98-5afd3433344d

196 New Construction, Additions and Remodel Existing Building Permits.

Permit fees are based on the valuation (building square footage times standard rate for occupancy) of each building or building addition. For fee calculation purposes, building square footage shall be the total area of all floors under roof and enclosed within the outer surface of the outside enclosing walls or columns. Building square footage includes roofed patios or porches, bay windows, basements, mezzanine and penthouses or other mechanical spaces. Building square footage does not include roof eaves or overhangs not exceeding 3 feet in depth, courts or light shafts open at the top, or unroofed patios or porches. The fees for each separate building shall be separately calculated. Minimum valuation of the work shall be determined by the Building Official based on nationally recognized standards and shall include the value of materials, labor, overhead, and profit. Table A: Building Safety Valuation-Based Permit Fee Project Valuation | Permit Fee Project Valuation | Permit Fee $1.00—$1,000.00 | $98.00 Minimum for Residential Water Heaters and Fences* $1.00—$1,000.00 | $195.00 Base fee only* $1,001.00—$10,000.00 | $195.00 on first $1,000.00, plus $12.00 for each additional $1,000.00, or fraction thereof, to and including $10,000.00 $10,001.00—$50,000.00 | $303.00 on first $10,000.00 plus $10.00 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00—$200,000.00 | $703.00 on first $50,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof, to and including $200,000.00 $200,001.00—$1,000,000.00 | $2,053.00 on first $200,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00—$10,000,000.00 | $9,253.00—On first $1,000,000.00 plus $5.00 for each additional $1,000.00, or fraction thereof, to and including $10,000,000.00 Over $10,000,000.00 | $54,253.00 on first $10,000,000.00 plus $5.00 for each additional $1,000.00, or fraction thereof, on the total amount of the project valuation Swimming pools are subject to a minimum permit fee of $234.00. A $30.00 aquatics program surcharge is also added to every swimming pool permit in accordance with Ordinance G-3114. EXAMPLE OF A PERMIT FEE CALCULATION: The following is an example of a permit fee calculation assuming a total project valuation** of $250,500.00: $2,053.00 base fee plus $459.00 (51 × $9.00) on the project valuation = Total permit fee cost of $2,512.00.

Ask a question about Phoenix law

Corpus searches the Phoenix sections it holds and shows the ones that match, with their citations. Free, no sign-in.