§ 28-27.1 — Temporary discharge authorization required
City Code of the City of Phoenix, Arizona (Phoenix City Code current through Ordinance G-7524, passed June 17, 2026 (municipal.codes publication, scraped 2026-11-17)) · Phoenix City Code § 28-27.1
Corpus is an independent public-information project, not the official City of Phoenix website. Stable reference: corpuslaw.us/code/1653ae2f-5dc6-4e2f-b321-84920360f130
Sec. 28-27.1. Temporary discharge authorization required.
A. Users intending to discharge the following to the sewer system for a duration no greater than one month must submit a temporary discharge authorization request form to the Department at least ten days prior to start of the proposed discharge: 1. Industrial wastewater; 2. Chiller water; 3. Distribution system maintenance and development water; 4. Potentially contaminated remediated groundwater; or 5. Stormwater. B. Any request for a temporary discharge authorization must contain the information specified in the request form and may require: 1. Results of any testing required to characterize the proposed discharge collected and analyzed in accordance with Section 28-44.3; and 2. Any additional information required by the Director to determine the potential of the proposed discharge to impact the POTW. C. Temporary discharge may not begin prior to receiving temporary discharge approval from the Director. D. At the conclusion of the discharge, the Director may require the user to report: 1. The actual discharged volume; and 2. The results of any testing required to characterize the actual discharge collected and analyzed in accordance with Section 28-44.3. E. Temporary discharge users may incur sewer charges in accordance with rates in Article V of this chapter for discharges greater than 5,000 gallons.
(Ord. No. G-6740, § 1, 2020)
Ask a question about Phoenix law
Corpus searches the Phoenix sections it holds and shows the ones that match, with their citations. Free, no sign-in.
