§ 106-10.28 — Mining and mineral extraction
Municipal Code of Surprise, Arizona (Supp. No. 68: codified through Ordinance No. 2026-07, adopted January 20, 2026) · Surprise Municipal Code § 106-10.28
Corpus is an independent public-information project, not the official City of Surprise website. Stable reference: corpuslaw.us/code/c448666f-caa9-4f08-9bbd-534843adc3fe
Sec. 106-10.28. - Mining and mineral extraction.
A. Extraction and processing of minerals and natural resources, such as mines, quarries and gravel pits and including concrete or asphalt batch plants as an accessory use shall comply with the following standards: 1. No excavation or processing of excavated materials shall be permitted within thirty (30) feet to the exterior boundaries and within one hundred fifty (150) feet to any residential zoned property or existing residence. 2. Material shall be excavated in such a manner so as to assure the convenient, efficient, and successful restoration of the land to hold to a minimum any adverse effects to adjacent and surrounding land as a result of piling or storing the overburden material. 3. Material shall be excavated in such a manner that leaves a minimum of two (2) feet of undisturbed sand, gravel, or soil over the entire excavation tract to provide a water bearing strata for any ground water; or more if the required geological report indicates that it is necessary. 4. The excavation operator shall maintain haul roads within the premise covered by the permit and the perimeter public roads in a dust-free condition. 5. The hours of operation, unless otherwise specified by the city, shall not be prior to 6:00 a.m. or after 10:00 p.m. unless the city grants special permission, for temporary expansion of the hours. 6. Operations shall be conducted in such a manner that excavated areas will not collect or permit stagnant water to remain therein. 7. The required development plan shall indicate compliance with the above standards and shall include the following topographic information at a minimum of five (5) foot contour intervals: a. Pre-excavation contours; b. Proposed excavation contours; c. Degree of slope of banks for all excavations; d. Location of any public facilities, irrigation canals, ditches, or streambeds; e. Post excavation re-use and contours.
Ask a question about Surprise law
Corpus searches the Surprise sections it holds and shows the ones that match, with their citations. Free, no sign-in.