Sec. 108-1.5. - Subdivisions.

A. The standard subdivision process involves both a preliminary plat and a final plat process. 1. A proposed division of improved or unimproved land or lands divided for the purpose of financing, sale or lease, whether immediately or in the future, into four (4) or more lots, tracts or parcels of land, or any such property, the boundaries of which have been fixed by a recorded plat, which is divided into more than four (4) parts. 2. If a new street is involved, a proposed division of improved or unimproved land or lands divided for the purpose of financing, sale or lease, whether immediately or in the future, which is divided into two (2) or more lots, tracts or parcels of land. 3. If the boundaries of which have been fixed by a recorded plat, a proposed division into more than two (2) parts of improved or unimproved land or lands divided for the purpose of financing, sale or lease, whether immediately or in the future. 4. A standard land division also includes any condominium, cooperative, community apartment, townhouse or similar project containing two (2) or more parcels, in which an undivided interest in the land is coupled with the right of exclusive occupancy of any unit located thereon, but plats of such projects need not show the buildings or the manner in which the buildings or airspace above the property shown on the plat are to be divided. B. The community development director or designee may at their discretion allow a concurrent submittal of both the preliminary and final plats when, in their judgement, the project scope is minor and the concurrent submittal will not cause problematic coordination between the preliminary and final plat. In the event that a change of zoning is necessary, the zoning application and subdivision may be processed concurrently, but in no event will the preliminary plat be approved until the change of zoning is adopted by the council. C. Preliminary plat overview. 1. The preliminary plat stage of land division involves detailed land division planning, including the submittal, review by staff, and approval of the preliminary plat by the planning and zoning commission. The applicant shall provide the City with all information, outlined at the preliminary plat concept review meeting and the information listed in Article 2 herein, essential to determine the character and general acceptability of the proposed development. 2. Preliminary plat approval constitutes authorization for the subdivider to proceed with preparation of the final plat and the engineering plans and specifications for public improvements. Preliminary plat approval does not authorize the developer to begin site preparation and grading, or any similar such work unless authorized in writing by the city engineer or designee. Preliminary approval is based upon the following: a. The preliminary plat shall be valid for twelve (12) months from the date of approval. The applicant may apply in writing for a single, twelve (12) month extension to be granted by the community development director or designee if in the opinion of the director there is no change in conditions within or adjoining the preliminary plat that would warrant a revision in the design of the original preliminary plat and that substantial progress has been made towards the final plat. b. The approval of the preliminary plat that was granted shall not be substantially changed prior to the expiration date and subsequent final plat. If the preliminary plat has expired and/or substantial changes have been made the land area shall not be allowed to proceed with final platting until a new preliminary plat is submitted and approved. c. Preliminary approval, in and of itself, does not assure final acceptance of streets for dedication nor constitute authorization to record the plat. D. Final plat overview. 1. The final plat stage of land division involves submittal, review and approval of the final plat, the improvement plans for all improvements required by ordinance, and recording of the plat with the county recorder. 2. The applicant shall provide the city with all information, outlined by the community development director or designee in conjunction with the final plat concept review meeting and consistent with information outlined in Article III herein, essential for review of the improvement plans and final plat. 3. The final plat shall conform to the approved preliminary plat and/or site plan/conditional use permit. 4. Prior to the final plat being administratively approved the following must have occurred: a. The city engineer or designee has approved the associated improvement plans and related final reports; and b. Letters from all involved utility companies approving the utility installation improvement plans and confirming both the availability of services and the intent to serve the subdivision with said services have been received by the city; and c. All required certifications from state and county agencies have been procured; and d. The city engineer has received the project cost estimate; and e. The city engineer has received the financial assurance document or the alternative improvements contract, per the development option chosen, in the form and amount to the city's satisfaction; and [f.] Documents, easements, and the necessary recording fees have been submitted; and [g.] In the event the final plat or map of dedication includes the dedication of rights-of-way to the city, a completed Phase I Environmental Assessment that has been prepared with the previous 90 days and which indicates no contaminations occurring within the right-of-way to be dedicated. 5. Once the final plat is approved, the community development director and city engineer shall sign the plat and the city clerk shall attest the signatures. 6. The final plat will be transmitted by city staff to the county recorder's office for recording; at the appropriate time and depending upon the development option being utilized as outlined below. 7. The simple approval of a final plat shall not constitute acceptance of dedication by the city of any street, easement, or other public area, shown on said plat. Recordation of a final plat shall constitute such acceptance and a statement of dedication along with signatures shall be included on the plat. E. Amended or corrected final plat overview. 1. If, after the approval and recording of a final plat, errors are found in the language or numbers on the recorded plat, the subdivider/applicant shall file a properly signed, corrected or revised final plat with the community development director. The plat shall be noted "corrected plat" under the name of the subdivision. Notations shall be made on the face of the plat listing all corrections made and the book and page numbers where the original plat was recorded. The community development director shall review the plat for corrections, secure the proper signatures on the corrected plat and send to the county recorder for recording. The recording of the corrected plat shall void the incorrect original plat. 2. If, after the approval and recording of a final plat, a subdivider/applicant wishes to modify the location of lot lines on part or all of the recorded plat, the subdivider/applicant shall submit a new final plat drawing with the revised lot arrangement. The plat shall be marked the "Replat of _______" under the name of the land division and shall be processed as a final plat. If the change is found to be substantial by the community development director, a new preliminary plat and final plat will be required as described herein. 3. If, after the approval and recording of a final plat, the subdivider/applicant wishes to substantially change the street and lot arrangement of a part or all of the platted area, the resulting subdivision shall be treated as a new submittal with both a preliminary plat and a final plat required. The subdivision shall be identified as the "Replat of _______." F. Exception. For any subdivision that consists of four (4) to ten (10) lots, tracts or parcels, each of which complies with the size requirements of this LDO, it may proceed without the requirement to prepare, submit and receive approval of a preliminary plat as a condition precedent to submitting a final plat. Requirements for dust-controlled access and drainage improvements shall not be waived.

(Ord. No. 2022-10, § 1(Exh. A), 4-19-22; Ord. No. 2024-03, § 1(Exh. A), 3-5-24; Ord. No. 2024-38, § 1(Exh. A), 12-17-24; Ord. No. 2025-21, § 1(Exh. A), 11-4-25)