§ 42-41 — Excavation in paved streets
Municipal Code of Surprise, Arizona (Supp. No. 68: codified through Ordinance No. 2026-07, adopted January 20, 2026) · Surprise Municipal Code § 42-41
Corpus is an independent public-information project, not the official City of Surprise website. Stable reference: corpuslaw.us/code/37d83fd0-4d3f-4b8e-81c3-74501f9e3ef1
Sec. 42-41. - Excavation in paved streets.
(a) Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this subsection, except where the context clearly indicates a different meaning: New street shall mean a roadway that has been recently constructed, when it is reconstructed or when it is renovated and opened to the public for use. Reconstruction shall mean completely rebuilding all the lanes of the street by removing all the pavement and aggregate base course material, re-compacting the sub-base and restoring the base material and then completely re-paving for a distance approved by the public works director or designee. Renovation shall mean a major rehabilitation which shall include mill and overlay or other similar roadway improvement work that physically modifies the surface of the roadway prior to applying new roadway surface or other similar work as determined by the public works director or designee. The public works director or designee shall determine the date of completion for new streets and the date each street was last reconstructed or renovated, based on the date the street was opened or reopened for traffic. (b) Pavement cuts in streets. (1) Permission to excavate in new streets shall not be granted for two years after completion of street construction, reconstruction or renovation. Any party wishing to engage in such excavation, including but not limited to utilities, shall determine alternate methods of making necessary repairs to avoid excavating in new streets. (2) Exceptions to the above are at the discretion of the public works director or designee and may be granted under the following circumstances, or other circumstances in the discretion of the public works director or designee: a. Emergency which endangers life or property. b. Interruption of essential utility service. c. Work that is mandated by city, county, state or federal legislation. d. Service for buildings where no other feasible means of providing service exists. (3) All permits which are issued shall be in accordance with the City of Surprise Municipal Code and Engineering Development Standards, current edition. (4) A condition of a street cut permit for cutting the pavement of a street shall be that the permittee renovate such pavement surface and street cross section in kind and in accordance with the City of Surprise Engineering Development Standards, current edition. (c) Pavement restoration fee. (1) Whenever any permit is required to cut into, open, bore, attach to, or make any break or disturbance to the street pavement of any City of Surprise maintained roadway, the permittee shall, in addition to the repairs required by this City Code, pay the city the pavement restoration fee established by Surprise City Council resolution in the Development Services Fee Schedule. (2) The pavement restoration fee shall be paid prior to or at the time a street cut permit is issued. In the event changes or amendments to the street cut permit are required which would result in a change in the amount of the pavement restoration fee, an adjusted fee shall be assessed and charged as follows: a. If the original pavement cut approved was from one square yard to 20 square yards, the pavement restoration fee shall be recalculated and adjusted fee assessed if the increase/decrease to the pavement cut is one square yard or larger. b. If the original pavement cut approved was from 21 square yards to 100 square yards, the pavement restoration fee shall be recalculated and an adjusted fee assessed if the increase/decrease to the pavement cut is more than five percent of the original. c. If the original pavement cut approved was for more than 100 square yards, the pavement restoration fee shall be recalculated and an adjusted fee assessed if the increase/decrease to the pavement cut is more than five square yards. Such amended permit shall be applied for and applicant shall pay any additional fees shall be paid within one week of the field change or prior to any new encroachment permits issued to applicant. (d) Pavement restoration schedule. (1) The definitions set forth in (a) are applicable to the provisions herein. (2) For up to two years after construction of new streets, renovation or reconstruction of a street: a. Each cut shall have a fee for the following areas: 1. Five square yards or less. 2. Six to 100 square yards. 3. Larger than 100 square yards. b. For cuts with two years after construction of new streets, renovation or reconstruction of a street, the applicant may, in lieu of paying the above fee, choose to perform a mill and overlay/inlay pursuant to the City of Surprise Engineering Development Standards, current edition, for a minimum of the full width of all lanes impacted by the cut(s) (outside lane includes to the curb) and for parkways and arterial streets extending a minimum length of 50 feet both directions from the area of the cut(s) and for all other streets extending a minimum length of 25 feet both directions from the area of the cut(s), or as more specifically directed by the public works director or designee. (3) The minimum fee shall be based on one square yard. If a pavement cut is so extensive, or the cuts in one area are so numerous that the permittee prefers to perform a renovation of the street in accordance with the public works director or designee's requirements, for the full width of any impacted land and the full length of any cuts plus 50 feet in both directions from the area of the cut on arterial streets and 25 feet in both directions from the area of the cut on collector streets, the permittee may choose to do such renovation in lieu of the pavement restoration fee and such reconstruction shall satisfy the fee requirement. (4) For pavement cuts in pavement more than two years after construction of new streets, renovation or reconstruction of a street, no fee will be charged. (5) For pavement cuts or potholes less than two square feet, no fee will be charged. If a pothole cut is done in advance of construction that will remove that portion of the pavement within a reasonable time as specified by the public works director or designee, no fee will be charged.
(Code 2007, § 15.28.200; Ord. No. 09-37, § 1, 11-12-09)
Ask a question about Surprise law
Corpus searches the Surprise sections it holds and shows the ones that match, with their citations. Free, no sign-in.