§ 58-8 — Developers—Contracts—Construction
Municipal Code of Surprise, Arizona (Supp. No. 68: codified through Ordinance No. 2026-07, adopted January 20, 2026) · Surprise Municipal Code § 58-8
Corpus is an independent public-information project, not the official City of Surprise website. Stable reference: corpuslaw.us/code/24076b73-f1f7-4c6f-ad30-496a159d6743
Sec. 58-8. - Developers—Contracts—Construction.
(a) The city, under the authorized signature of its mayor, review by the city attorney and attested as to appropriate city council action by the city clerk, may enter into any contract with any person who proposes to engage in the development of property within the city service area, any subservice area, or otherwise extend the city utilities. (b) Each contract shall specify the cost of construction and installation, and the method of reimbursement for all costs incurred by the city in connection with an extension; or in methods of reimbursement. (c) A developer who wishes to extend facilities must employ a civil engineer registered in the State of Arizona to perform the field engineering and to prepare detailed plans and specifications for such extension. This engineer shall not be the city engineer or any engineer retained by or operating as an independent contractor on behalf of the city as the city engineer. The final detailed plans and specifications for the extension must be approved by the city as being within city specifications and as are in accordance with good engineering practices before construction begins. The city will charge to the developer a plan review fee. All extensions of the city utilities shall have council approval prior to the beginning of construction. (d) Private water lines, including irrigation lines, within public rights-of-way and easements shall be reviewed, approved, permitted and inspected by the city. (e) The construction of any facility or extensions shall meet the specifications, requirements and approval of the city and shall be subject to in-progress inspection by the city. A fee reasonably calculated to reimburse the city for its costs of inspection may be assessed. No construction shall commence until engineering plans have been approved by the city, a preconstruction conference has been held and a construction permit has been issued if necessary. (f) All construction of any facility or extension shall meet the specifications, requirements and approval of the city and shall be subject to in-progress inspection. (g) Every person shall notify the city at least 48 hours prior to cutting into the city utility system. In making a connection with the city utilities, no person shall commence a physical alteration until an inspector is present. No person shall discharge into the utilities prior to obtaining city approval of construction.
(Ord. No. 2012-06, § 1, 5-8-2012)
Ask a question about Surprise law
Corpus searches the Surprise sections it holds and shows the ones that match, with their citations. Free, no sign-in.
