Sec. 25-123. - Deferments of undergrounding.

(a) Deferment of undergrounding off-site lines may be requested from the City Engineer for a (re)development with small frontage, where the cost is substantially more per unit length than it would otherwise be if a longer length (usually a minimum of six hundred sixty (660) feet), including the (re)development frontage, were being undergrounded at the same time. At all times, on-site lines shall be placed underground. A request for deferment shall be requested in writing to the City Engineer and include the following: (1) The (re)developer shall procure from the appropriate utility companies a reliable estimate of the current cost for undergrounding what is required along the (re)development frontage, including new and existing lines in the adjacent off-site frontage. (2) The (re)developer shall procure from the appropriate utility companies a reliable estimate of the current cost for undergrounding a longer, more practical length that includes the (re)development frontage (usually a minimum of six hundred sixty (660) feet). (3) If the project involves improvements in the public right-of-way (bike paths, sidewalks, landscaping, etc.) and deferment of undergrounding will involve costs of future restoration of those improvements, the (re)developer shall furnish a reliable estimate of such future restoration costs in current dollars. (b) In reviewing a request for deferment, the City Engineer shall consider the costs of installing overhead utilities, the cost of undergrounding the utilities, and the status of development in the area affected by the request. (c) If deferment is authorized by the City Engineer, the (re)developer shall deposit with the City a sum sufficient to cover all deferred construction required herein. Monies received shall be used by the City for undergrounding utilities associated with (re)developments within the City boundaries. (d) Utility companies may request deferment of undergrounding for power or communication line extensions through undeveloped areas. The request with justification shall be submitted to the City Engineer. No deferred compensation fees will be required for this type of deferment. (e) If deferment is denied by the City Engineer, the (re)developer or utility company may appeal the City Engineer's decision to the City Council. (f) If deferment is approved by the City Engineer, an interested party who is affected by the decision may appeal the decision to the City Council.

(Ord. No. 88.85, 1-12-89; Ord. No. O2014.30, 7-31-14)

Ask a question about Tempe law

Corpus searches the Tempe sections it holds and shows the ones that match, with their citations. Free, no sign-in.