Sec. 30-6. - Requirements.

(a) Plat Submittal Review. (1) In the event that the site has processed entitlements with a Development Plan Review, this process fulfills requirements for any preliminary review. Through the entitlement process conditions of approval will determine what type of Subdivision Plat is required. (2) If a subdivision plat is being proposed independent of a new development, an application filing for plat submittal review of any subdivision requires the subdivider to submit a site plan of existing conditions or potential development with new property lines for building code and zoning compliance review. (b) Subdivider Responsibilities: (1) Comply with (a) application filing for plat submittal review as described above. (2) Provide plans regarding land use, street and lot arrangement, tentative lot and tract sizes. (3) Provide proposed water supply, sewage disposal, surface drainage and street improvements. (4) Identify irrigation facilities on or adjacent to the proposed Subdivision. (5) Notify the Arizona Department of Transportation, where the plat abuts a state highway. (6) Notification to the County Health Department. (7) Notification to private utilities inclusive of but not limited to natural gas, electric, telecommunications, cable, etc. (c) City Responsibilities: (1) Check existing zoning of the site for conformance of development standards with existing or proposed site configuration and lot lines and determine if a zoning change is necessary. (2) Determine the adequacy of existing or proposed schools, parks and other public spaces. (3) Verify the site relationship to major streets, transit facilities, bicycle facilities, pedestrian ways, utility systems, and adjacent land uses and to determine any unusual problems such as topography, utilities, flooding, access, easements, etc. (4) Determine site access for fire, solid waste services and emergency response and sufficient land for circulation and parking of existing or proposed uses on site. (5) Verify conformance with drainage and flood control requirements. (6) Determine which process is necessary for this request: Preliminary, Final or Amended Subdivision Plat, Lot Line Adjustment, Lot Combination or Lot Split. (7) Advise the applicant of specific public objectives, right of way dedications, design modifications or improvement standards for the proposed project. (8) Advise the applicant of the procedural steps and general plat requirements. (d) Street Naming: The subdivider may propose the street names subject to approval by the City Engineer at the preliminary or final plat stage. (e) Easement Planning. (1) Utility easements. Easements for utilities shall be provided alongside lot lines, three (3) feet on each side of lot lines for distribution facilities. (2) Utility easements on curvilinear streets. For lots facing on curvilinear streets, utility easements or alleys may consist of a series of straight lines with points of deflection not less than one hundred twenty (120) feet apart. Points of deflection should always occur at the junction of side and rear lot lines on the side of the exterior angle. Curvilinear easements or alleys may be provided, providing that the minimum radius for the alley or easement shall be not less than eight hundred (800) feet. (3) Drainage easements. Where a stream or important surface drainage course abuts or crosses the tract, dedication of a public drainage easement of a width sufficient to permit widening, deepening, relocating, or protecting said water course shall be required. (4) Lot areas. Land within a public street or drain easement or land within a utility easement for major power transmission (tower) lines or pipelines shall not be considered a part of the minimum required lot area except where lots exceed one-half (1/2) acre in area. This shall not be construed as applicable to land involved in utility easements for distribution or service purposes. (5) Bus bay and shelter easements. All lots at far side of arterial to arterial and arterial to collector intersections shall provide bus bay and shelter easements as shown in the City of Tempe Standard Details. (6) Multi-use path easements. All lots abutting multi-use corridors as designated by the most recent update of the Tempe Bikeway Plan and Map shall provide easements as shown in the City of Tempe Standard Details.

(Ord. No. O2022.29, §§ 1, 2, 9-8-22)