For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-306 — Development Plan Review

The Code of the City of Tempe, Arizona (Supp. No. 34, Update 1: codified through Ordinance No. O2026.34, enacted June 25, 2026) · Tempe Zoning and Development Code § 6-306

Corpus is an independent public-information project, not the official City of Tempe website. Stable reference: corpuslaw.us/code/65eceae4-be20-4678-af16-aca63a28263b

Section 6-306 - Development Plan Review.

A. Purpose. The purpose of a Development Plan Review is to provide review of architectural drawings, including but not limited to a site plan, building elevations, landscape plan, preliminary grading and drainage plan, materials and color samples, structures, and signs. A development plan provides a plan of development supported by technical construction documents as necessary to encourage, protect, and enhance the functional and attractive appearance of the City of Tempe. B. Applicability. Development plan review shall include the following, except individual single-family dwellings: 1. Major Development Plan Review. Applies to all new development and building expansions over five thousand (5,000) square feet net floor area; major changes in elevations; and residential development consisting of six (6) or more dwelling units. 2. Minor Development Plan Review. Applies to all new development and building modifications or expansions up to five thousand (5,000) square feet of net floor area; minor changes in site plans, landscape plans or building elevations; comprehensive sign packages and residential development consisting of two (2) to five (5) dwelling units. C. Procedure. Major and Minor Development Plan Reviews are processed as administrative review decisions through the Community Development Director, or designee. D. Approval Criteria. Development plan approval shall be based on consideration of the following criteria: 1. Placement, form, and articulation of buildings and structures provide variety in the streetscape; 2. Building design and orientation, together with landscape, combine to mitigate heat gain/retention while providing shade for energy conservation and human comfort; 3. Materials are of a superior quality, providing detail appropriate with their location and function while complementing the surroundings; 4. Buildings, structures, and landscape elements are appropriately scaled, relative to the site and surroundings; 5. Large building masses are sufficiently articulated so as to relieve monotony and create a sense of movement, resulting in a well-defined base and top, featuring an enhanced pedestrian experience at and near street level; 6. Building facades provide architectural detail and interest overall with visibility at street level (in particular, special treatment of windows, entries and walkways with particular attention to proportionality, scale, materials, rhythm, etc.) while responding to varying climatic and contextual conditions; 7. Plans take into account pleasant and convenient access to multi-modal transportation options and support the potential for transit patronage; 8. Vehicular circulation is designed to minimize conflicts with pedestrian access and circulation, and with surrounding residential uses; 9. Plans appropriately integrate Crime Prevention Through Environmental Design principles such as territoriality, natural surveillance, access control, activity support, and maintenance; 10. Landscape accents and provides delineation from parking, buildings, driveways and pathways; 11. Signs have design, scale, proportion, location and color compatible with the design, colors, orientation and materials of the building or site on which they are located; and 12. Lighting is compatible with the proposed building(s) and adjoining buildings and uses, and does not create negative effects. E. Time Limitations. Development plan approval shall be void if the development is not commenced or if an application for a building permit has not been submitted, whichever is applicable, within twelve (12) months after the approval is granted or within the time stipulated by the decision-making body. The period of approval is extended upon the time review limitations set forth for building permit applications, pursuant to Chapter 8, Article I. Tempe Administrative Code, of the Tempe City Code. An expiration of the building permit application will result in expiration of the development plan.

(Ord. No. 2005.83, 1-5-2006; Ord. No. 2009.15, 10-22-2009; Ord. No. O2016.64, 1-12-2017; Ord. No. O2121.44, 10-14-2021; Ord. No. O2022.27, 9-8-2022; Ord. No. O2025.46, 11-6-2025, effective 1-1-2026)

Ask a question about Tempe law

Corpus searches the Tempe sections it holds and shows the ones that match, with their citations. Free, no sign-in.