§ 10.2.1 — COMPLIANCE REVIEW, PROPOSED DEVELOPMENT
Tucson Code (General Ordinances) (2026 S-151: current through August 18, 2026) · Tucson Unified Development Code § 10.2.1
Corpus is an independent public-information project, not the official City of Tucson website. Stable reference: corpuslaw.us/code/06758b7a-7655-4e67-9a28-f6beee6155f4
10.2.1. COMPLIANCE REVIEW, PROPOSED DEVELOPMENT
No land may be used or occupied; no site Site The land area consisting of a portion of a lot, an entire lot, or contiguous lots, not including dedicated public property, designated for development as a single entity. improvement, modification, or construction started; no existing use or structure Structure A physical element constructed or erected with a fixed location on the ground or attached to another physical element having a fixed location at, below, or above grade. Structures include such elements as, but are not limited to, buildings, paved areas, walls, fences, posts, and patios. expanded, reconstructed, changed, or otherwise altered; and no land may be divided into multiple parcels Parcel The same as “lot.” The term “parcel” is generally listed to describe a piece of property recorded as a division of land by a metes and bounds description and may or may not be a part of a subdivision plat. In a project where a division of land is proposed, each proposed division is considered a lot for the purpose of applying the requirements of the zoning ordinance. until compliance with the provisions of the UDC Unified Development Code (UDC) Chapter 23B of the Tucson Code as adopted by the Mayor and Council establishing zoning regulations governing the use, placement, spacing, and size of land and structures within the corporate limits of the City. Such regulations are applied on individual properties through the use of zoning districts. The boundaries of these districts are depicted on the adopted City Zoning Maps. For the purposes of convenience and ease of use, the UDC is also published as a separate book from the Tucson Code. has been certified through a zoning review process by PDSD. No City City Same as City of Tucson. agency may issue a permit for excavation Excavation The mechanical removal of earth material. , grubbing, grading Grading Any excavating, filling, or combination thereof. , paving, demolition, or construction of any sort before certification of compliance with provisions of the UDC Unified Development Code (UDC) Chapter 23B of the Tucson Code as adopted by the Mayor and Council establishing zoning regulations governing the use, placement, spacing, and size of land and structures within the corporate limits of the City. Such regulations are applied on individual properties through the use of zoning districts. The boundaries of these districts are depicted on the adopted City Zoning Maps. For the purposes of convenience and ease of use, the UDC is also published as a separate book from the Tucson Code. has been determined by PDSD. In the event a zoning regulation requires interpretation, such interpretation shall be issued by the Zoning Administrator in accordance with Sections 1.5, Interpretations of the Unified Development Code Unified Development Code (UDC) Chapter 23B of the Tucson Code as adopted by the Mayor and Council establishing zoning regulations governing the use, placement, spacing, and size of land and structures within the corporate limits of the City. Such regulations are applied on individual properties through the use of zoning districts. The boundaries of these districts are depicted on the adopted City Zoning Maps. For the purposes of convenience and ease of use, the UDC is also published as a separate book from the Tucson Code. .
Ask a question about Tucson law
Corpus searches the Tucson sections it holds and shows the ones that match, with their citations. Free, no sign-in.
