§ 13-56.8 — Materials Handling
Municipal Code of the City of Alameda, California (Codified through Ordinance No. 3398 N.S., passed April 21, 2026. (Supp. No. 74)) · Alameda Municipal Code § 13-56.8
Corpus is an independent public-information project, not the official City of Alameda website. Stable reference: corpuslaw.us/code/cdefe3b3-31b8-428a-a51c-4a648840c236
13-56.8 - Materials Handling.
The permittee shall elect to follow one or more of the courses of action set forth below before beginning any excavation activities in the area subject to this Section 13-56. Unless otherwise demonstrated by the permittee by means of reconnaissance investigation pursuant to subsection 13-56.8a, or unless the permittee prepares site management plans pursuant to subsection 13-56.8c, soil below the threshold depth in the area of the marsh crust/subtidal zone, as depicted on Exhibit A, must be managed as though it were hazardous pursuant to subsection 13-56.8b. The permittee may elect to follow subsection 13-56.8a, but must comply with subsection 13-56.8b or 13-56.8c if testing demonstrates that the materials below the threshold depth are hazardous materials. Copies of all reconnaissance testing results and/or existing information used to satisfy the reconnaissance investigation requirements of subsection 13-56.8a shall be reported to and filed with the City. All observations or encounters with the marsh crust/subtidal zone during excavation shall be reported to the City. a. Reconnaissance Investigation to Rule Out the Presence of Hazardous Materials Below the Threshold Depth. The permittee may elect to use reconnaissance borings, pursuant to a plan prepared by a qualified registered engineer or registered geologist, licensed in the State of California, to rule out, to the satisfaction of the Chief Building Official, the presence of hazardous materials below the threshold depth in the area to be excavated. As part or all of the reconnaissance plan, the permittee may make use of existing information, where appropriate, if the existing information is directly relevant to the location and depth to be excavated and contains observations or results of analyses that assist in concluding whether hazardous materials are present. The reconnaissance report shall include a description of all observations from below the threshold depth evidencing the presence or absence of the marsh crust/subtidal zone. 1. If hazardous materials are found below the threshold depth within the area to be excavated at any time (during reconnaissance or during excavation), the permittee shall comply with either subsection 13-56.8b or subsection 13-56.8c, at his or her election. 2. If hazardous materials are not found below the threshold depth within the area to be excavated, no additional materials controls, except as otherwise may be required under applicable Federal, State or local law, are required under this Section 13-56. b. Handling Materials Excavated From Below the Threshold Depth as Hazardous Materials. If the permittee has not ruled out the presence of hazardous materials pursuant to subsection 13-56.8a, or elects not to prepare a site management plan and materials testing program pursuant to subsection 13-56.8c, the permittee shall presume that materials excavated from below the threshold depth must be disposed at an appropriately permitted disposal facility. In addition, no excavated materials from below the threshold depth may be stockpiled prior to disposal or returned to the excavation. c. Preparation of Construction Site Management Plan for Handling Materials Excavated From Below the Threshold Depth. 1. In lieu of handling materials excavated from below the threshold depth pursuant to the restrictions in subsection 13-56.8b, the permittee may elect to hire a qualified registered engineer or registered geologist, licensed in the State of California, to develop a site-specific construction site management plan, including a materials testing program, to the satisfaction of the Chief Building Official. The construction site management plan shall include, at a minimum, provisions governing control of precipitation run-on and run-off from stockpiled soils, soil segregation, securing of stockpiled soils, duration of stockpiling, and contingency plans for handling materials excavated from below the threshold depth that prove to be hazardous materials. 2. The permittee shall hire a qualified registered engineer or registered geologist, licensed in the State of California, to oversee compliance with the approved construction site management plan, and shall transmit to the Chief Building Official upon completion of the project written certification of compliance with the construction site management plan. The certification report shall include a description of all observations from below the threshold depth evidencing the presence or absence of the marsh crust/subtidal zone.
(Ord. No. 2824 N.S.)
Ask a question about Alameda law
Corpus searches the Alameda sections it holds and shows the ones that match, with their citations. Free, no sign-in.
