2-61.8 - Design Build.
a. This section provides for an alternative and optional procedure on bidding on certain building construction projects. b. The City Council may authorize use of a design-build contract for projects estimated to cost one million dollars ($1,000,000) or more when it is anticipated that this contracting method will reduce project cost, expedite project completion, or provide design features not achievable through the design-bid-build method. The City may award a design-build contract based on either the low responsible bid or best value. c. As used in this section: 1. "Best value" means a value determined by objective criteria and may include, but is not limited to, price, features, functions, life-style costs, and other specified criteria. 2. "Design-build" means a procurement process in which both the design and construction of a project are procured from a single entity. d. Design-build projects shall progress as follows: 1. The City shall prepare a set of documents setting forth the scope of the project in sufficient detail to describe the City's needs and minimum requirements. 2. Based on the documents prepared in paragraph (1), the City shall prepare a request for proposals that invites interested parties to submit competitive sealed proposals in the manner prescribed by the City. 3. The City shall prequalify design-build entities and may use the standard questionnaire developed by the Department of Industrial Relations. 4. The City shall establish a procedure for final selection of the design-build entity. Selection may be based on a competitive bidding process resulting in lump-sum bids by the prequalified design-build entities, with the contract to be award-ed to the lowest responsible bidder. In the alternative, selection may be based upon a design-build competition based upon best value and other criteria set forth in the request for proposals upon four (4) affirmative votes of the City Council per City Charter section 3-15. e. The City Manager or his/her designee is authorized to develop and implement appropriate rules and regulations necessary to carry out the intent of this Chapter. At a minimum, the rules and regulations will address the following issues: information to be included in design-build requests for proposals, procedures for evaluating design-build proposals and awarding design-build contracts, bonding and insurance requirements for design-build contractors, and subcontractor listing requirements for design-build proposals.
(Ord. No. 2919 N.S. § 1)
Ask a question about Alameda law
Corpus searches the Alameda sections it holds and shows the ones that match, with their citations. Free, no sign-in.