For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-58.4 — Requirements

Municipal Code of the City of Alameda, California (Codified through Ordinance No. 3398 N.S., passed April 21, 2026. (Supp. No. 74)) · Alameda Municipal Code § 30-58.4

Corpus is an independent public-information project, not the official City of Alameda website. Stable reference: corpuslaw.us/code/e468baee-6442-4c49-ade3-9085bba3b9c0

30-58.4 - Requirements.

a. The provisions of the State of California MWELO (California Code of Regulations, Title 23, Division 2, Chapter 2.7), shall be implemented by the City of Alameda. b. For all covered projects that require the approval of a building permit, plan check or design review, the applicant/developer shall: 1. Submit a Landscape Document Package compliant with the most recent version of the Landscape Document Package Checklist, on file with the Community Development Department; 2. Record the date of approval of the Landscape Document Package in the Certificate of Completion; 3. Upon approval of the Landscape Document Package, submit a copy of the Water Efficient Landscape Worksheet to EBMUD; 4. Be subject to the Standard Landscape Conditions of Approval and most recently adopted Bay-Friendly Landscaping Guidelines; 5. Submit a Certificate of Completion upon approval of the Landscape Document Package and issuance of permits. c. The provisions of this section shall not apply to: 1. Registered local, state or federal historical sites; 2. Ecological restoration projects that do not require a permanent irrigation system; 3. Existing plant collections, as part of botanical gardens and arboretums open to the public. d. Landscape plans for covered projects with landscaped areas less than two thousand five hundred (2,500) square feet in size, may either comply with the provisions of Section 30-58.1(a) above, or conform to the prescriptive measures of Appendix D of the Landscape Document Package Checklist. e. For projects using treated or untreated graywater or rainwater captured on site, any lot or parcel within the project that has less than two thousand five hundred (2,500) square feet of landscape and meets the lot or parcel's landscape water requirement (estimated total water use) entirely with treated or untreated graywater or through stored rainwater captured on site is subject only to Appendix B condition (4) of the most recently adopted Landscape Document Package Checklist. f. All covered projects are required to divert (reuse or recycle) one hundred (100%) percent of excavated soil and plant and land clearing debris. g. Plants located adjacent to buildings, sidewalks, roads or other obstructions shall be installed to accommodate their minimum spread, according to a published third-party reference. h. Plant species considered invasive by the California Invasive Plant Council shall not be installed. i. All covered projects that are either owned or maintained by the City or developed as a public-private partnership that equals or exceeds one hundred thousand ($100,000.00) dollars (in 2009 dollars) in construction costs and adjusted annually to reflect changes in the San Francisco Bay Area Construction Cost Index published in Engineering News Record Magazine initiated on or after the effective date of this chapter shall meet the most recent minimum Bay-Friendly Landscape scorecard.

(Ord. No. 3153 N.S., § 1, 6-7-2016)

Ask a question about Alameda law

Corpus searches the Alameda sections it holds and shows the ones that match, with their citations. Free, no sign-in.