§ 30-7.5 — Off-Street Electric Vehicle (EV) Charging Requirements
Municipal Code of the City of Alameda, California (Codified through Ordinance No. 3398 N.S., passed April 21, 2026. (Supp. No. 74)) · Alameda Municipal Code § 30-7.5
Corpus is an independent public-information project, not the official City of Alameda website. Stable reference: corpuslaw.us/code/5ffcab28-7957-4e81-9297-dfec82299140
30-7.5 - Off-Street Electric Vehicle (EV) Charging Requirements.
Electric vehicle charging facilities shall be provided and maintained for projects whenever off-street parking is provided, including in existing parking facilities. The number and type of charging facilities provided shall meet the following requirements. Where two (2) or more primary uses occupy a single site, the EV parking required for each use shall be calculated separately, then summed to determine the total number of spaces permitted for the site. Uses ancillary to a primary use shall utilize the same requirement as the primary use. a. Residential Use—With Private, Dedicated Garage. One (1) parking space provided shall be a Level 2 EV Ready Space. b. Residential Use—Multifamily Shared Parking Facilities. Twenty-five (25%) percent of parking spaces provided shall be at least a Level 2 EV Ready Space. Twenty-five (25%) percent of spaces provided shall be at least a Level 1 EV Ready Space. c. Nonresidential—Offices, research and development, life sciences, banks, financial services, institutional uses, community care facilities, hospitals, personal services, health clinics, industrial, distribution, hotels/motels and other similar uses with daily parking demand. Ten (10%) percent of parking spaces provided shall be equipped with an installed electric vehicle charging station. Thirty (30%) percent of parking spaces provided shall be Level 2 EV Capable. One 80kW Direct Current Fast Charger may be substituted for up to five (5) Electric Vehicle Charging Stations. d. Nonresidential—Retail uses, grocery stores, commercial recreation, restaurants, bars, cafes, theaters or similar uses with hourly parking demand. Ten (10%) percent of parking spaces provided shall be equipped with an installed Electric Vehicle Charging Station. One 80kW Direct Current Fast Charger may be substituted for up to five (5) Electric Vehicle Charging Stations. e. Automatic Load Management Systems (ALMS) permitted. Nothing in this subsection excludes the use of Automatic Load Management Systems in parking facilities. ALMS systems must be designed to deliver a minimum of 8-amperes and not less than 1.4-kiloWatts at the provided voltage, to each EV Capable, EV Ready or EVCS space served by the ALMS. f. Non-proprietary infrastructure. Electric vehicle supply equipment installed pursuant to this subsection shall be compatible with a broad range of electric vehicle makes and models. g. Definitions: 1. Level 1 EV Ready Space shall mean a space that is served by a complete electric circuit with a minimum of 110/120 volt, 20-ampere capacity including electrical panel capacity, and such additional elements deemed necessary by the Building Official. 2. Level 2 EV Ready Space shall mean a space that is served by a complete electric circuit with a minimum of 208/240 volt, 40-ampere capacity including electrical panel capacity, and such additional elements deemed necessary by the Building Official, or b) electric vehicle supply equipment (EVSE) with a minimum output of 30 amperes. 3. Level 2 EV Capable shall mean a parking space linked to a listed electrical panel with sufficient capacity to provide at least 208/240 volts and 40-amperes to the parking space. Raceways linking the electrical panel and parking space only need to be installed in spaces that will be inaccessible in the future, and such additional elements deemed necessary by the Building Official. 4. Electric Vehicle Charging Station (EVCS) shall mean a parking space that includes installation of electric vehicle supply equipment (EVSE) with a minimum capacity of thirty (30) amperes connected to a circuit serving a Level 2 EV Ready Space. EVCS installation may be used to satisfy a Level 2 EV Ready Space requirement. Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code, Article 625. 5. Automatic Load Management Systems (ALMS): A control system which allows multiple EV chargers or EV-Ready electric vehicle outlets to share a circuit or panel and automatically reduce power at each charger, providing the opportunity to reduce electrical infrastructure costs and/or provide demand response capability. h. Exceptions. The Planning Director or Planning Board may authorize exceptions to the EV charging requirements of this section for one hundred (100%) percent affordable housing development if such exception is required to address cost constraints, unique site constraints, or any unique or special characteristics of the use.
(Ord. No. 3309 N.S., § 5, 11-16-2021)
Ask a question about Alameda law
Corpus searches the Alameda sections it holds and shows the ones that match, with their citations. Free, no sign-in.
