§ 8-20.03 — VERIFICATION OF STANDARDS
City of Antioch, California, Code of Ordinances (2025 S-41: Current through Ordinance 2243-C-S, passed 12-10-2024) · Antioch Municipal Code § 8-20.03
Corpus is an independent public-information project, not the official City of Antioch website. Stable reference: corpuslaw.us/code/821cd245-9e23-4b84-8b5f-aa08922252ac
§ 8-20.03 VERIFICATION OF STANDARDS.
Prior to submitting an application, the applicant shall: (A) Verify to the applicant's reasonable satisfaction through the use of standard engineering evaluation techniques that the support structure for the small residential rooftop solar energy system is stable and adequate to transfer all wind, seismic and dead and live loads associated with the system to the building foundation; and (B) At the applicant's cost, verify to the applicant's reasonable satisfaction using standard electrical inspection techniques that the existing electrical system including existing line, load, ground and bonding wiring as well as main panel and subpanel sizes are adequately sized, based on the existing electrical system's current use, to carry all new photovoltaic electrical loads. (Ord. 2106-C-S, passed 8-11-15)
Ask a question about Antioch law
Corpus searches the Antioch sections it holds and shows the ones that match, with their citations. Free, no sign-in.
