§ 9-4.2010 — STANDARDS FOR SUBDIVISIONS
City of Antioch, California, Code of Ordinances (2025 S-41: Current through Ordinance 2243-C-S, passed 12-10-2024) · Antioch Municipal Code § 9-4.2010
Corpus is an independent public-information project, not the official City of Antioch website. Stable reference: corpuslaw.us/code/36b988af-13e3-43dd-9f66-aabc1c75d7c3
§ 9-4.2010 STANDARDS FOR SUBDIVISIONS.
(A) All preliminary subdivision proposals shall identify the flood hazard area and the elevation of the base flood. (B) All final subdivision plans shall provide the elevations of proposed structures and pads. If the site is filled above the base flood, the final pad elevation shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator. (C) All subdivision proposals shall be consistent with the need to minimize flood damages. (D) All subdivision proposals shall have public utilities and facilities, such as sewer, gas, electrical, and water systems, located and constructed to minimize flood damages. (E) All subdivisions shall provide adequate drainage to reduce exposure to flood hazards. ('66 Code, § 9-4.2010) (Ord. 708-C-S, passed 5-12-88) Penalty, see §§ 1-2.01 et seq.
Ask a question about Antioch law
Corpus searches the Antioch sections it holds and shows the ones that match, with their citations. Free, no sign-in.
