For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 14.12.140 — Approval of plans for sewerage construction

Municipal Code of the City of Bakersfield, California (Bakersfield Municipal Code current through Ordinance 5223, passed August 26, 2026 (municipal.codes publication, scraped 2026-11-17)) · Bakersfield Municipal Code § 14.12.140

Corpus is an independent public-information project, not the official City of Bakersfield website. Stable reference: corpuslaw.us/code/1f33f035-48a6-40b2-b865-ee6e4a0a6325

14.12.140 Approval of plans for sewerage construction.

A. No person, other than employees of the city or persons contracting to do work for the city shall construct or cause to be constructed, or alter or cause to be altered, any public sewer, lateral sewer, house connection or industrial connection sewer over six inches in diameter, sewage pumping plant, pollution control plant, or other sewerage facility within the city where existing or proposed wastewater flows will discharge directly or indirectly to facilities of the city without first obtaining approval of sewerage construction plans from the city engineer. B. The applicant shall submit to the city engineer for approval construction plans and such specifications and other details as required to describe fully the proposed sewerage facility. The plans shall have been prepared under the supervision of and shall be signed by an engineer of suitable training registered in the state. C. Plans for sewerage construction shall not be approved by the city engineer for any facility which will convey industrial wastewater unless the discharger has first obtained a permit for industrial wastewater discharge. D. Plans and specifications for sewerage construction shall meet all requirements as established by adopted City Standards S-7, S-8, S-20 through S-23 and S-39 and all amendments thereto as established from time to time by the city engineer. E. An approval of plans for sewerage construction shall expire one year after date of approval unless construction has been initiated.

(Ord. 4740 § 1, 2013; Ord. 3667 § 1, 1995)

Ask a question about Bakersfield law

Corpus searches the Bakersfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.