For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 15.18.040 — Final inspection

Municipal Code of the City of Bakersfield, California (Bakersfield Municipal Code current through Ordinance 5223, passed August 26, 2026 (municipal.codes publication, scraped 2026-11-17)) · Bakersfield Municipal Code § 15.18.040

Corpus is an independent public-information project, not the official City of Bakersfield website. Stable reference: corpuslaw.us/code/fae84e4b-c0d5-4942-bc72-b42ece91d5ff

15.18.040 Final inspection.

At the time of final inspection, the permit applicant shall provide the owner of the property with: A. Certificate of completion. B. Certificate of installation. C. Irrigation schedule for the plants once established shall be posted next to controller showing the following: 1. A diagram of the irrigation station watering zones and associated irrigation station number; 2. Irrigation duration per station (if seasonal, provide seasonal durations); 3. If the watering schedule at the time of final inspection is set for plant establishment, information shall be given to the owner on when the Irrigation Schedule, as posted, shall be started. D. Schedule of landscape and irrigation maintenance, irrigation controller manual. (Ord. 4840 § 1, 2016)

Ask a question about Bakersfield law

Corpus searches the Bakersfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.