For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 13.04.160 — Inspection and acceptance required before backfilling

City Code, City of Buena Park, California (Includes legislation through Ord. No. 1769 adopted July 14, 2026) · Buena Park City Code § 13.04.160

Corpus is an independent public-information project, not the official City of Buena Park website. Stable reference: corpuslaw.us/code/cbd61b54-33ba-4126-b80f-4e770b6f6715

§ 13.04.160: Inspection and acceptance required before backfilling.

A. No person shall backfill any trench or excavation made for the purpose of laying a sewer of any kind until the pipes laid therein shall have been inspected by the city engineer and a certificate of inspection given. The entire length of the sewer and all connections, including the wye or tee at the main sewer, to the point at which the cast iron soil pipe begins shall be fully exposed for inspection. B. If any section of the pipe or any portion of the work is not in accordance with city specifications or does not conform to all of the requirements of this chapter or other sewer standards which from time to time may be adopted by the city council, the sewer contractor shall make such changes or additions as are necessary to conform to the provisions of this chapter and shall, after the changes or additions are made, leave the pipe and work exposed and do no backfilling until inspection has been made and acceptance as above provided.

( Prior code § 24-26 ; Amended during 1990 codification )

Ask a question about Buena Park law

Corpus searches the Buena Park sections it holds and shows the ones that match, with their citations. Free, no sign-in.