§ 18.208.290 — Start of construction

City Code, City of Buena Park, California (Includes legislation through Ord. No. 1769 adopted July 14, 2026) · Buena Park City Code § 18.208.290

Corpus is an independent public-information project, not the official City of Buena Park website. Stable reference: corpuslaw.us/code/7eaf0a81-7f3f-49bc-976c-75cf55c34300

§ 18.208.290: Start of construction.

"Start of construction" includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, placement or other improvement was within one hundred eighty days of the permit date. The actual start means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. "Permanent construction" does not include land preparation such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footing, piers, or foundations; or the erection of temporary forms; nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or not part of the main structure.

( Ord. 1210 § 3 (2.0 (28)), 1987 )

Ask a question about Buena Park law

Corpus searches the Buena Park sections it holds and shows the ones that match, with their citations. Free, no sign-in.