§ 19.720.100 — Right-of-Way Improvements
City Code, City of Buena Park, California (Includes legislation through Ord. No. 1769 adopted July 14, 2026) · Buena Park City Code § 19.720.100
Corpus is an independent public-information project, not the official City of Buena Park website. Stable reference: corpuslaw.us/code/1fbbd746-6e40-4b77-8ef2-e1bed0b7e366
§ 19.720.100: Right-of-Way Improvements.
A. The purpose of this section is to establish requirements for right-of-way improvements for all MU zoned parcels within the City of Buena Park on which property improvements are made. "Right-of-way improvements" shall include curbs, gutters, sidewalks, driveway approaches, handicapped (ADA) ramps, water lines and appurtenances, sewer lines and appurtenances, storm drainage facilities, property dedications of right-of-way, streetlights, pavement markings, signs, and street trees. B. Required Improvements. All projects shall be required to provide the following right-of-way improvements as are deemed necessary and applicable by the Director of Public Works: 1. Sidewalk and Parkway. Construction or repair of a sidewalk and parkway adjoining the site. The sidewalk shall have a minimum clear width of five (5) feet with a parkway, or six (6) feet if the sidewalk adjoins the curb, or shall be the minimum width of the adjoining properties along that side of the street. 2. Curb and Gutter. Construction or repair of curbs and gutters adjoining the site. All unused curb cuts shall be replaced with a full-height curb and gutter. 3. Street Trees. As required by Subsection 18.24.190 of the Municipal Code. 4. Bicycle Trail. As required by Subsection 18.64.020. Construction of bicycle trail as required by the "Fourth District Bikeways Strategy" adopted by the Orange County Transportation Authority. C. Encroachment Permit Required. Except as otherwise provided in this Section, it is unlawful for any person to encroach or make or cause to be made any encroachment in the public right-of-way or on property subject to a public utility easement, or other easement available for use by public utilities, without first obtaining an encroachment permit from the Public Works Department. 1. Encroachment permits for right-of-way improvements shall be obtained prior to the issuance of a building permit and prior to any work being done within the right-of-way. 2. Street improvement plans for all work in the public right-of-way shall be prepared by a licensed civil engineer, whose signed engineer's stamp shall appear on the plans. Final construction plans and specifications shall be approved by the City Engineer, and released for construction, prior to the issuance of the encroachment permit. D. Parkways. A parkway (i.e., sidewalk strip, parking strip, or tree buffer) is a portion of the street right-of-way lying between the curb and sidewalk. 1. Any objects placed in the parkway (e.g., rocks, benches, etc.) shall not present a hazard or public nuisance and shall not block a clear line of sight across the parkway. E. Objective Design Standards. 1. General. a. Commercial uses and development standards are subject to the provisions of Division 5 of Title 19 of the BPMC, unless stated otherwise herein. b. Projects developed within the Mixed-Use Zones shall comply with the most recent Orange County Fire Authority Guidelines for access, water and Architectural Guidelines. 2. Project Design. a. Grading, storm drain, street, sewer, water, and erosion control plans shall be prepared by a Registered Engineer, at a minimum scale of 1" = 40', and on 24" by 36" sheets. Any proposed improvements shall be designed and constructed per City Standards. Any existing improvements in the public right-of-way, adjacent to project parcel frontage, that are not in compliance with the Americans with Disabilities Act (ADA) shall be removed and reconstructed or added to meet the ADA requirements and must comply with City Standards. (i) Projects within the flood zone of the Federal Emergency Management Agency shall be developed per Division II of Title 18 of the City Code. (ii) Street dedications including corner cutoff dedications to the City for the project frontage will be required per the Master Street Plan. (iii) Existing overhead utilities and poles along the project frontage shall be undergrounded or an in-lieu fee may be paid per the City's latest fee schedule. All new utilities to the project site shall be undergrounded. (iv) New streetlights along the project frontage shall be required every 150-feet unless already existing. Streetlights mounted on wooden poles shall be replaced with marblelite poles. (v) Trees and ground cover with an irrigation system shall be required within the parkway landscaping area along the project frontage. The species of tree to be planted will be determined by the City of Buena Park's Urban Forest Management Plan. The property owner shall be responsible for the maintenance of this landscaping area per Chapter 19.1112.070 of the Buena Park Municipal Code. (vi) Driveway approaches, sidewalks, curb, and gutter along the project frontage that are lifted, fractured or failing shall be removed and replaced per City standards. (vii) All vehicular access to the site shall be provided in locations approved by the Traffic Division. An emergency access within the project parcel shall be approved by the Orange County Fire Authority and an approved copy of the plan shall be submitted to the Engineering Division with the submittal of the grading plan. (viii) Traffic Impact fees shall be in accordance with City Resolution 9726 and the latest City Fee Schedule. Sewer, water, and stormwater impact fees shall be per the latest City Fee Schedule. (ix) A site distance analysis, prepared by a registered engineer, shall be submitted for approval for any structures that are substantial is size, such as monument signs, that are proposed adjacent to existing or proposed driveway. (x) Provide an engineering study for any proposed sewer and water connections to the City system. The study shall be prepared by a registered civil engineer for approval by the City Engineer. Any infrastructure upgrades necessary to meet the fire code or the domestic water capacity shall be mitigated by the developer. Easements shall be dedicated as needed to accommodate a new public water or sewer system. The proposed utility connections shall be made to the City water and sewer systems in accordance with the City Code, standards and applicable Federal, State and County regulations. (xi) A double check detector assembly is required for domestic and fire service connections, and a reduced pressure principle device (RPPD) is required for irrigation service connection per City standards, and devices shall be supplied and installed by contractor. Contractors shall supply and install City approved water meters in the public right-of-way. (xii) A hydrology and/or hydraulics study, prepared by a registered engineer, shall be submitted for approval when drainage is altered and/or there is a net increase of the stormwater for the proposed project. The storm drain system shall be designed and constructed for a minimum of a 25-year flood per the County of Orange standards. It shall be privately owned and maintained. (xiii) Easement shall be granted to the City when public water and sewer systems are installed within private land. (xiv) All existing public facilities in conflict with new improvements shall be relocated at no cost to the City. The property owner shall dedicate or cause to be dedicated all easements needed to accommodate the relocation, modification or installation of facilities to be maintained by the City or any public utility company. b. Tract maps and parcel maps shall be prepared in accordance with the State Subdivision Map Act and Division I of Title 18 of the City Code. All improvements required to be completed by the applicant shall be in accordance with the City standards and specifications. All maps shall be concurrently reviewed by the City and the Orange County Survey Department. The applicant shall forward all plan check comments received from the Orange County Survey Department to the City for each plan check. 3. Permit Issuance. a. All fees, deposits, and bonds associated with improvements required by the Public Works Department shall be paid prior to the issuance of permits for construction. The fee amounts are specified in the City Fee Schedule. b. Before exercising any right or performing any obligation pursuant to any permit issued by the Public Works Department, the developer/contractor shall obtain a City Business License and submit required insurance certificates. c. A Transportation Hauling permit shall be obtained to operate or move a vehicle or combination of vehicles or special mobile equipment of a size or weight of vehicle or load exceeding the maximums specified in the California Vehicle Code (CVC) and the Caltrans Transportation Permit Manual. d. Prior to issuance of a grading permit, applicant shall record an approved WQMP that includes the Master Covenant & Agreement and an Operational Maintenance Plan with the Orange County Recorder's office. Two hard copies of the WQMP in 3-ring binders shall be provided to the City. e. Prior to final release of the project by the Public Works Department, or the refund of any cash deposits, the developer/contractor shall provide the City with a warranty bond to be held by the City for a period of one (1) year, for all public facilities and improvements. f. Prior to the grant of occupancy by the City or commencement for the approved use, all improvements required by the Public Works Department shall be completed. 4. Construction. a. A traffic control plan, prepared by a registered engineer, shall be submitted for approval for all utility connections, street improvements, and any other work performed in the public right-of-way that require a lane closure. A traffic control plan, prepared by a registered engineer, shall also be submitted for work on private property that results in lane closures. b. When more than one trench cut is made to install utility lines, then the street shall be either slurry sealed or grind and capped with AC to the nearest lane line of a trench cut from property line to property line. The method of replacing the pavement in kind or better shall be decided based on existing pavement condition. c. An Engineered Grading and Utility Certification shall be certified by the project engineer. Each phase of construction, fill and soil compaction, rough grading including pad elevations, final grading, utilities, and Water Quality Management Plan shall be certified by the project engineer and submitted to the City. d. Applicant shall abandon any existing private water wells per the City and Orange County Health Department requirements. e. Prior to issuance of occupancy, applicant shall demonstrate all structural BMPs have been constructed in conformance with the approved WQMP. f. Any work on State Highway, Beach Boulevard from the I-5 Freeway to north City limit, shall require a Caltrans permit. g. The applicant/contractor shall be responsible for protecting all existing horizontal and vertical survey controls. Any survey controls disturbed during construction shall be reset per Orange County Surveyor Standards after construction. h. All trash collection services needed during construction or after project completion shall be obtained from the City's authorized provider.
( Ord. 1754 , 6/24/2025 )
Ask a question about Buena Park law
Corpus searches the Buena Park sections it holds and shows the ones that match, with their citations. Free, no sign-in.